Integration Test of Iter Full-scale Vacuum Vessel Sector
نویسندگان
چکیده
The full-scale Sector Model Project, which was initiated in 1995 as one of the Large Seven ITER R&D Projects, completed all R&D activities planned in the ITER-EDA period with the joint effort of the ITER Joint Central Team (JCT), the Japanese, the Russian Federation (RF) and the United States (US) Home Teams. The fabrication of a full-scale 18 toroidal sector, which is composed of two 9 sectors spliced at the port center, was successfully completed in September 1997 with the dimensional accuracy of – 3 mm for the total height and total width. Both sectors were shipped to the test site in JAERI and the integration test was begun in October 1997. The integration test involves the adjustment of field joints, automatic Narrow Gap Tungsten Inert Gas (NG-TIG) welding of field joints with splice plates, and inspection of the joint by ultrasonic testing (UT), which are required for the initial assembly of ITER vacuum vessel. This first demonstration of field joint welding and performance test on the mechanical characteristics were completed in May 1998 and the all results obtained have satisfied the ITER design. In addition to these tests, the integration with the mid plane port extension fabricated by the Russian Home Team, and the cutting and re-welding test of field joints by using full-remotized welding and cutting system developed by the US Home Team, are planned as post EDA activities.
منابع مشابه
Development and operation of an ITER relevant inspection Robot
Robotic operations are one of the major maintenance challenges for ITER and future fusion reactors. In particular, in vessel inspection operations without loss of conditioning will be mandatory. In this context, an Articulated Inspection Arm (AIA) has been developed by CEA within the European work programme framework, which aims at demonstrating the capabilities of a multi-purpose in-vessel Rem...
متن کاملA mobile robot with parallel kinematics to meet the requirements for assembling and machining the ITER vacuum vessel
The present paper introduces a mobile parallel robot developed for International Thermonuclear Experimental Reactor (ITER). he task of the robot is to carry out welding and machining processes inside the ITER vacuum vessel. The kinematic design f the robot has been optimized for the ITER access. The kinematic analysis is given in the paper. A virtual prototype of the arallel robot is built. A d...
متن کاملHybrid Parallel Robot for the Assembling of ITER
The international thermonuclear experimental reactor (ITER) is a joint international research and development project that aims to demonstrate the scientific and technical feasibility of fusion power. The reactor tokomak (vacuum vessel) is made of stainless steel, and contains nine sectors welded together; each sector has about the size of 10 meter high and 6 meter wide. The sectors of ITER vac...
متن کاملA Coherent FM Laser Radar Based System for Remote Metrology in ITER*
The plasma facing surfaces in ITER must be aligned to millimeter accuracy with respect to the magnetic flux surfaces to prevent impurity influx into the plasma and to avoid component damage. Checking of in-vessel component alignment during initial assembly, operation, and subsequent maintenance is anticipated. A fully remote metrology system is necessary, particularly since major remote operati...
متن کاملUWFDM-1077 Three-Dimensional Neutronics Analysis for the ITER Divertor Cassette Design Options
Three-dimensional neutronics calculations have been performed for the ITER divertor cassette design options to determine the nuclear parameters in the cassettes and assess the impact of streaming on vacuum vessel and toroidal field (TF) coil damage. The local nuclear parameters in the components of the reference cassette design are similar or lower than those in the cassette design option with ...
متن کامل