Performance Evaluation of a Multi-Part JIT Production System
نویسندگان
چکیده
Under stochastic demand and deterministic processing times, we discussed a single-part JIT production system with the production-ordering and supplier Kanbans and derived the stationary distributions of the backlogged demand. In this paper, we extend the system to a multi-part JIT production system, deterministic processing times and withdrawals with lead time. These conditions are more realistic than the previous papers. We formulate the system and show that a shortage of some parts degrades the performance of the system in full production case. A part with the minimum average number of supplier Kanbans which has great influence on the performance is especially focused. Moreover, the occurrence probability of backlogged demand is calculated and the importance of increasing the number of Kanbans of the parts with the minimum average number of supplier Kanbans is shown by using simulation.
منابع مشابه
The performance evaluation of a multi-stage JIT production system with stochastic demand and production capacities
This paper discusses a single-item, multi-stage, serial Just-in-Time (JIT) production system with stochastic demand and production capacities. The JIT production system is modeled as a discrete-time, M/G/1type Markov chain. A necessary and sufficient condition, or a stability condition, under which the system has a steady-state distribution is derived. A performance evaluation algorithm is then...
متن کاملAnalysis of interactions among the barriers to JIT production: interpretive structural modelling approach
‘Survival of the fittest’ is the reality in modern global competition. Organizations around the globe are adopting or willing to embrace just-in-time (JIT) production to reinforce the competitiveness. Even though JIT is the most powerful inventory management methodologies it is not free from barriers. Barriers derail the implementation of JIT production system. One of the most significant tasks...
متن کاملSimulation based optimization of multi-product supply chain under a JIT system
It is scientifically challenging to determine the inventory level all through the supply chain in such a way that the desired objectives such as effectiveness and responsiveness of the supply chain system can be obtained. Simulation is a means for solving various problems which cannot be solved by regular exact models such as mathematical ones due to their complexity. The present paper is aime...
متن کاملUsing Electromagnetism Algorithm for Determining the Number of kanbans in a Multi-stage Supply Chain System
This paper studies the multi-stage supply chain system (MSSCM) controlled by the kanban mechanism. In the kanban system, decision making is based on the number of kanbans as well as batch sizes. A kanban mechanism is employed to assist in linking different production processes in a supply chain system in order to implement the scope of just-in-time (JIT) philosophy. For a MSSCM, a mixed-integer...
متن کاملSimulation of a Two Cards JIT Production System
This paper presents a summary of the results from the simulation of a given two-stages production system which uses JIT. The system consists of an assembly line with two automated assembly cells and two assembly stock points and one manufacturing cell with three manufacturing stock points for storing reserved parts and one receiving stock. Carts with fixed capacity are used for handling the par...
متن کامل