Backward Simulation in Food Industry for Facility Planning and Daily Scheduling

نویسندگان

  • Tom-David Graupner
  • Matthias Bornhäuser
  • Wilfried Sihn
چکیده

In the light of high capital expenditure for manufacturing facilites in food and process industry, an increasing number of variants and frequentliy changing sales developments, simulation models are becoming more and more important for the support of capacity and production planning. In the following, the use of a simulation toolset for the support of tactical capacity planning and operative production planning is presented. It was implemented in cooperation with a global player of food industry. The challenge of the project was the implementation of a backward simulation. Instead of filling food from a tank into cups, the computer simulates the process inversely. The advantage of the chosen procedure is that the provision of all components of a dessert or yogurt product at the time of filling as well as an efficient utilization of resources is ensured. Figure 1: Picture of a production line INTRODUCTION New products and an increasing number of variants define the requirements to production planning in food industry. In the milk processing industry, production planning and production control are particularily complex as the sequence in which aggregates are provided with different products is highly influential on cleaning effort and therefore on the productivity of the facility. Due to storage life restrictions, pre-defined periods of time for aggregate occupancies have to be respected in the production process. In addition, the products are produced at the latest moment possible in order to meet the retailers’ and consumers’ demands for fresh products. Statements whether the facilities can produce the forecast order size on schedule or capacity adaptations are necessary were difficult to make up to now. For production planning, there were no software tools at the orderer’s disposal which made it possible to calculate aggregate occupancies on the basis of weekly bottling plans (figure 1) [1, 2]. THE SIMULATION PROJECT Our customer decided to approach the problem by representing the existing dessert and yogurt production in a simulation model. Thus, the task was to conceive and develop a flexible simulation model and to train the employees of the company in handling the simulation tool. The existing facility and its aggregates, facility topology and product-specific facility occupancies was represented in the simulation model. Aggregateand product-specific cleaning restrictions were included in the model. The aggregates are at the simulation model’s command in the form of a library. The advantage of doing so is the possibility to transfer this library into other simulation models. Thereby, development time for new facility topologies of comparable facilites can be significantly reduced. The simulation model is parametrized by an Access data base. Specific know-how about the simulation software therefore is not necessary for the application as it is controlled via the data base. The master data of the aggregates, products, restrictions and facility topology are stored there and can be modified by the user. In addition, even the strategies for facility occupancy can be influenced by the user via the data base. The existing control logic, which guarantees an optimum load of the filling lines and a resource-saving aggregate occupancy, are accounted for in the simulation model. THE YOGURT AND DESSERT PRODUCTION The production of fresh milk products is a multi-level process. In the following, this process is presented very roughly only, as the process wanted to be kept secret by our partner. 1. Preparation of mixing = Pumping milk, sugar, vanilla powder from storage containers via pipelines into mixing tanks. 2. Mixing = The ingredients are mixed during a certain period of time. 3. Storing in tanks = The mixed matter is stored until a production line is prepared. 4. Production = The dessert (cream) matter is heated via pipelines and afterwards chilled again. 5. Incubating = The heated yogurt matter is filled into tanks. Subsequently, a bacteria culture is added and the matter has to maturate for about 12-36 hours. 6. Chilling = The yogurt matter is chilled at a cooler to slow down bacteria activity. 7. Storing = The finished dessert matter is stored until the filling facility is prepared. 8. Filling = The dessert matter is frothed up with whiskers and then filled into cups. As it becomes clear, it is a long way from milk to yogurt and dessert. Several aggregates, each with specific properties as throughput, capacity, cleaning time etc., are necessary to run this process. − Tanks: Filling tanks, incubation tanks, mixing tanks with their properties as mass flows, volume, cleaning restrictions. − Filling lines with the properties throughput in cups/h, cleaning restrictions, changeover. − Production lines with their properties throughput in liters/h, sterilization processes, line occupancy. − The yogurt and dessert matter which is continuously transforming during the process from raw milk to the cup. Dessert and yogurt products mostly consist of 2-3 components (semi-finished products), which – in different flavours – are filled into cups of different dimensions. Thus, two semi-finished products, e.g. yogurt and strawberry, have to be filled synchronously. Though, the production start of the semi-finished products thereby is totally different. The challenges in daily planning are the following: − The lines should never stand still as they are determinative for the throughput. − Cleaning is to avoid as this is waste of material and expenditure. − The number of tank occupancies should be as small as possible in order to economize cleaning effort. − Simultaneous filling and draining of tanks cuts down throughput time. − Combining filling orders of the same flavor which are filled into different coutry-specific packings in the last production step. CONTINUOUS PROCESSES IN THE DISCRETE SIMULATOR In discrete simulation, only defined points of time on a fictive time bar are taken into account. Discrete here means isolated resp. disjoined. When a mobile object enters a resource, the simulator puts a mark shifted of the processing time. The administrator of the incident, who controls all chronological simulation activities, subsequently jumps directly to the next discrete point on the time bar and executes the given orders. The production considered here is a batch-oriented production. But many decisions go on at discrete points of time so that modelling takes place both batchand incident-oriented. Incident-oriented: In the receptacles, the semi-finished and finished products are represented as single objects (object with one volume resp. one mass). Advantage: easy batch management in the simulator. Realization of a decentral control. Continuous: In the continuous processes (e.g. production line), there is a flow-oriented representation, i.e. no disintegration of batches into a multitude of objects, but an exact, mathematically correct representation. Advantage: higher simulation speed. As control and scheduling logic made up for the main complexity in the project, a discrete simulator was used in the presented project and the continuous processes were emulated. SCHEDULING LOGIC In this paragraph, it is shown why a pure forward simulation is not target-oriented. The backward simulation-based approach was realized [3, 4, 5]. Forward simulation-based approach By forward simulation, we understand the simulation of production orders in the direction of the material flow. Starting from the start date, the production orders are dispatched to production until they leave production after the processing. For a better illustration, a production and assemply process is represented in figure 2. A module consists of three components. Each sphere symbolizes a process step. When the three components are completed, assemply can begin. Figure 2: Forward simulation A weak point of pure forward simulation is that only in a special case all components are completed at the same time. In figure 2 unwanted waiting time arises for the components in the two upper rows. In order to minimize throughput time, the start dates of the components can be varied. When the processing procedures interact, it is not sufficient to only begin the start times delayed by the waiting times. Such an interaction exists when the processing procedures of different components are executed on the same resources. A backward simulation is recommended in order to minimize unwanted waiting time. Backward simulation-based approach The backward simulation corresponds to the inversion of forward simulation. The clocks quasi run backwards. The finished products are “decomposed” into their components in the course of time. In figure 3, the “decomposition” of a finished product into its components is depicted. As start date of simulation, the delivery date is is chosen. For each work step we get the latest start and finish date. Thus, short throughput times can be obtained. When a work step starts later than the corresponding basic date, this unavoidably leads to scheduling delay. The completion date of the last work step can be used as start date for forward simulation. start date of backward simulation Figure 3: Backward simulation In some cases, the backward simulation i complete scheduling of dessert production esses can be exactly inverted. For instance, can only be formulated forwardly. Furthe backward simulation no statements about pancies etc. can be made. Thus, subsequent simulation, a forward simulation is executed Forward simulation (subsequent to ba tion) e start dates The above-mentioned cognitions show tha backward simulation nor a pure forward about satisfactory results. When executing laiton after a backward simulation and taki dates of the components, the advantages of are unified (figure 4). By this combined backward-forward sim geous start dates of the components are o short throughput times result. The modeli which may occur because of backward si compensated by a forward run that can be ex Figure 4: Backward-forward simulation time s insufficient for as not all procmany restrictions rmore, in a pure receptacle occuto the backward .

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

An application of principal component analysis and logistic regression to facilitate production scheduling decision support system: an automotive industry case

Production planning and control (PPC) systems have to deal with rising complexity and dynamics. The complexity of planning tasks is due to some existing multiple variables and dynamic factors derived from uncertainties surrounding the PPC. Although literatures on exact scheduling algorithms, simulation approaches, and heuristic methods are extensive in production planning, they seem to be ineff...

متن کامل

ExPlanTech: Multi-agent Framework for Production Planning, Simulation and Supply Chain Management

We present a unified multi-agent technology for decision making support in production planning and scheduling, manufacturing simulation in and supply chain management. The technology has been tested on several industrial cases and is used in a daily production planning processes of one important automobile industry supplier in the Czech Republic.

متن کامل

An Integrated Approach for Facility Location and Supply Vessel Planning with Time Windows

This paper presents a new model of two-echelon periodic supply vessel planning problem with time windows mix of facility location (PSVPTWMFL-2E) in an offshore oil and gas industry. The new mixed-integer nonlinear programming (MINLP) modelconsists ofa fleet composition problem and a location-routing problem (LRP). The aim of the model is to determine the size and type of large vessels in the fi...

متن کامل

An application of principal component analysis and logistic regression to facilitate production scheduling decision support system: an automotive industry case

Production planning and control (PPC) systems have to deal with rising complexity and dynamics. The complexity of planning tasks is due to some existing multiple variables and dynamic factors derived from uncertainties surrounding the PPC. Although literatures on exact scheduling algorithms, simulation approaches, and heuristic methods are extensive in production planning, they seem to be ineff...

متن کامل

Ergonomics and simulation-based approach in improving facility layout

The use of the simulation-based technique in facility layout has been a choice in the industry due to its convenience and efficient generation of results. Nevertheless, the solutions generated are not capable of addressing delays due to worker’s health and safety which significantly impact overall operational efficiency. It is, therefore, critical to incorporate ergonomics in facility design. I...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:

دوره   شماره 

صفحات  -

تاریخ انتشار 2004