A Modified Scheduling Algorithm for The FIP Fieldbus System
ثبت نشده
چکیده
As we stated before FIP is one of the fieldbus systems, these systems usually consist of many control loops that communicate and interact with each other via single network channel (i.e. cable). Here we will try to develop a scheduling policy that will guarantee a fair distribution of this medium between these control loops, and at the same time takes into account several important parameters in designing such systems. These parameters are:
منابع مشابه
Schedulability Analysis in the FIP Fieldbus Accounting for Inserted Idle-Time
The FIP fieldbus (Factory Instrumentation Protocol, presently known as WorldFIP) uses, normally, an off-line scheduler that generates a cyclic static table containing the allocation of bus-time slots to the transaction of process control variables. Such table is organized in time-windows, called elementary cycles, within which the transactions are placed by the scheduler. The table is scanned o...
متن کاملA Systematic Design of a Real-time Robot Control System Based on a Fieldbus Communication Network
This paper suggests an architecture of the robot control system that is based on the eldbus network and proposes a systematic design method on it. The main advantages of the architecture are that the cost of cabling is reduced and the maintenance e ort can be reduced. In addition, robot control system employing eldbus avoids dependency of a special vendor and it can distribute control functions...
متن کاملA modified branch and bound algorithm for a vague flow-shop scheduling problem
Uncertainty plays a significant role in modeling and optimization of real world systems. Among uncertain approaches, fuzziness describes impreciseness while for ambiguity another definition is required. Vagueness is a probabilistic model of uncertainty being helpful to include ambiguity into modeling different processes especially in industrial systems. In this paper, a vague set based on dista...
متن کاملAn adaptive modified firefly algorithm to unit commitment problem for large-scale power systems
Unit commitment (UC) problem tries to schedule output power of generation units to meet the system demand for the next several hours at minimum cost. UC adds a time dimension to the economic dispatch problem with the additional choice of turning generators to be on or off. In this paper, in order to improve both the exploitation and exploration abilities of the firefly algorithm (FA), a new mo...
متن کاملA Design of a Network-based Robot Control System using FIP
This paper suggests an architecture for the robot control system that is based on the network. The main advantage of the architecture is that the weight of the control system is far lighter and the size is far smaller without reduction of the performance. In addition, the cabling cost and the maintenance effort can be drastically reduced. This paper considers the communication latency and the s...
متن کامل