Planning and Scheduling to Minimize Tardiness

نویسنده

  • John N. Hooker
چکیده

We combine mixed integer linear programming (MILP) and constraint programming (CP) to minimize tardiness in planning and scheduling. Tasks are allocated to facilities using MILP and scheduled using CP, and the two are linked via logic-based Benders decomposition. We consider two objectives: minimizing the number of late tasks, and minimizing total tardiness. Our main theoretical contribution is a relaxation of the cumulative scheduling subproblem, which is critical to performance. We obtain substantial computational speedups relative to the state of the art in both MILP and CP. We also obtain much better solutions for problems that cannot be solved to optimality. We address a planning and scheduling problem that occurs frequently in manufacturing and supply chain contexts. Tasks must be assigned to facilities and scheduled on each facility subject to release dates and due dates. Tasks assigned to a given facility may run in parallel if desired, subject to a resource constraint (cumulative scheduling). We consider two objectives: minimizing the number of late tasks, and minimizing total tardiness. The problem can be formulated entirely as a constraint programming (CP) problem or a mixed integer/linear programming (MILP) problem. However, these models are hard to solve. By linking CP and MILP in a hybrid method, we obtain significant speedups relative to the state of the art in both MILP and CP. The linkage is achieved by logic-based Benders decomposition. The facility assignment problem becomes the master problem and is solved by MILP, while the scheduling problem becomes the subproblem (slave problem) and is solved by CP. The primary theoretical contribution of this paper is a linear relaxation of the cumulative scheduling subproblem. We find that including such a relaxation in the master problem is essential to the success of the Benders method. We solve problem instances in which tasks have the same release date and different due dates, although the the method is valid for different release dates as well. We obtain substantial speedups on nearly all instances relative to MILP (as represented by CPLEX), which in turn is generally faster than CP (as represented by the ILOG Scheduler). On larger instances, the hybrid method generally achieves speedups of two or three orders of magnitude when minimizing the number of late tasks, and it solves significantly more problems to optimality. There is a lesser but still significant speedup when minimizing total tardiness, and even when the hybrid method cannot obtain provably optimal solutions, it obtains much better solutions than provided by MILP in the same time period.

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

A Novel B and B Algorithm for a Unrelated Parallel Machine Scheduling Problem to Minimize the Total Weighted Tardiness

This paper presents a scheduling problem with unrelated parallel machines and sequencedependent setup times that minimizes the total weighted tardiness. A new branch-and-bound (B and B) algorithm is designed incorporating the lower and upper bounding schemes and several dominance properties. The lower and upper bounds are derived through an assignment problem and the composite dispatching rule ...

متن کامل

Design of a Hybrid Genetic Algorithm for Parallel Machines Scheduling to Minimize Job Tardiness and Machine Deteriorating Costs with Deteriorating Jobs in a Batched Delivery System

This paper studies the parallel machine scheduling problem subject to machine and job deterioration in a batched delivery system. By the machine deterioration effect, we mean that each machine deteriorates over time, at a different rate. Moreover, job processing times are increasing functions of their starting times and follow a simple linear deterioration. The objective functions are minimizin...

متن کامل

Electromagnetism-like algorithm for fuzzy flow shop batch processing machines scheduling to minimize total weighted earliness and ‎tardiness‎

‎In this paper, we study a flow shop batch processing machines scheduling problem. The fuzzy due dates are considered to make the problem more close to the reality. The objective function is taken as the weighted sum of fuzzy earliness and fuzzy tardiness. In order to tackle the given problem, we propose a hybrid electromagnetism-like (EM) algorithm, in which the EM is hybridized with a diversi...

متن کامل

Fuzzy Multi-objective Permutation Flow Shop Scheduling Problem with Fuzzy Processing Times under Learning and Aging Effects

In industries machine maintenance is used in order to avoid untimely machine fails as well as to improve production effectiveness. This research regards a permutation flow shop scheduling problem with aging and learning effects considering maintenance process. In this study, it is assumed that each machine may be subject to at most one maintenance activity during the planning horizon. The objec...

متن کامل

Minimizing the total tardiness and makespan in an open shop scheduling problem with sequence-dependent setup times

We consider an open shop scheduling problem with setup and processing times separately such that not only the setup times are dependent on the machines, but also they are dependent on the sequence of jobs that should be processed on a machine. A novel bi-objective mathematical programming is designed in order to minimize the total tardiness and the makespan. Among several mult...

متن کامل

Fuzzy Programming for Parallel Machines Scheduling: Minimizing Weighted Tardiness/Earliness and Flow Time through Genetic Algorithm

Appropriate scheduling and sequencing of tasks on machines is one of the basic and significant problems that a shop or a factory manager encounters; this is why in recent decades extensive studies have been done on scheduling issues. One type of scheduling problems is just-in-time (JIT) scheduling and in this area, motivated by JIT manufacturing, this study investigates a mathematical model for...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:

دوره   شماره 

صفحات  -

تاریخ انتشار 2005