Knowledge Engineering Approach for Power Transformer Asset Management
نویسندگان
چکیده
The main objective of the utility company is to maximize the utilization of its existing assets during their life cycle meeting both engineering and financial requirements. However, the knowledge available in the utility is unstructured and often in tacit form. This paper presents a knowledge based system for the utility companies in order to make an optimal decision on power transformer with their utilization. CommonKADS methodology, a structured development for knowledge and expertise representation, is utilized for designing and developing knowledge based system. A case study of One MVA power transformer of Nepal Electricity Authority is presented. The results show that the reusable knowledge can be categorized, modelled and utilized within the utility company using the proposed methodologies. Moreover, the results depict that utility company can achieve both engineering and financial benefits from its utilization.
منابع مشابه
Knowledge Based Model for Power Transformer Life Cycle Management Using Knowledge Engineering
Under the limitation of investment budget, a utility company is required to maximize the utilization of their existing assets during their life cycle satisfying both engineering and financial requirements. However, utility does not have knowledge about the status of each asset in the portfolio neither in terms of technical nor financial values. This paper presents a knowledge based model for th...
متن کاملArtificial Intelligence Based Approach for Identification of Current Transformer Saturation from Faults in Power Transformers
Protection systems have vital role in network reliability in short circuit mode and proper operating for relays. Current transformer often in transient and saturation under short circuit mode causes mal-operation of relays which will have undesirable effects. Therefore, proper and quick identification of Current transformer saturation is so important. In this paper, an Artificial Neural Network...
متن کاملWind Turbine Transformer Optimum Design Assuming a 3D Wound Core
A wind turbine transformer (WTT) is designed using a 3D wound core while the transformer’s total owning cost (TOC) and its inrush current performance realized as the two objective functions in a multi-objective optimization process. Multi-objective genetic algorithm is utilized to derive Pareto optimal solutions. The effects of inrush current improvement on other operating and design parameters...
متن کاملFlexible Power Electronic Transformer for Power Flow Control Applications
This paper proposes a Flexible Power Electronic Transformer (FPET) for the application in the micro-grids. The low frequency transformer is usually used at the Point of Common Coupling (PCC) to connect the low voltage grid and utility network to each other. The conventional 50Hz transformer results in enhanced low voltage-grid power management system during grid-connected operation. In this pap...
متن کاملTransformer Lifetime Modelling Based on Condition Monitoring Data
Effective transformer lifetime models are of paramount importance for asset management but are hindered by the lack of actual failure data. The paper hence proposes an approach for functional lifetime modelling of power transformers based on condition monitoring data. Transformer’s functional lifetime is proposed to be modelled as following a two-parameter Weibull distribution whose parameters ...
متن کامل