Approximation schemes for minimizing total (weighted) completion time with release dates on a batch machine

نویسندگان

  • Zhaohui Liu
  • T. C. Edwin Cheng
چکیده

A batch machine is a machine that can process a number of jobs simultaneously as a batch, and the processing time of a batch is equal to the longest processing time of the jobs assigned to it. In this paper we present a polynomial time approximation scheme (PTAS) for scheduling a batch machine to minimize the total completion time with job release dates. Also, we present a fully polynomial time approximation scheme (FPTAS) for scheduling an unbounded batch machine, which can process an arbitrary number of jobs simultaneously, to minimize the total weighted completion time with job release dates.

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

A $(2 + \epsilon)$-approximation for precedence constrained single machine scheduling with release dates and total weighted completion time objective

We give a (2 + ǫ)-approximation algorithm for minimizing total weighted completion time on a single machine under release time and precedence constraints. This settles a recent conjecture made in [18]

متن کامل

Scheduling to Minimize Total Weighted Completion Time: Performance Guarantees of LP-Based Heuristics and Lower Bounds

There has been recent success in using polyhedral formulations of scheduling problems not only to obtain good lower bounds in practice but also to develop provably good approximation algorithms. Most of these formulations rely on binary decision variables that are a kind of assignment variables. We present quite simple polynomial-time approximation algorithms that are based on linear programmin...

متن کامل

A 2.542-approximation for precedence constrained single machine scheduling with release dates and total weighted completion time objective

We present a √ e/( √ e−1)-approximation algorithm for the nonpreemptive scheduling problem to minimize the total weighted completion time of jobs on a single machine subject to release dates and precedence constraints. The previously best known approximation algorithm dates back to 1997; its performance guarantee can be made arbitrarily close to the Euler constant e [18].

متن کامل

A fuzzy mixed-integer goal programming model for a parallel machine scheduling problem with sequence-dependent setup times and release dates

This paper presents a new mixed-integer goal programming (MIGP) model for a parallel machine scheduling problem with sequence-dependent setup times and release dates. Two objectives are considered in the model to minimize the total weighted flow time and the total weighted tardiness simultaneously. Due to the com-plexity of the above model and uncertainty involved in real-world scheduling probl...

متن کامل

Fast approximation schemes for Boolean programming and scheduling problems related to positive convex Half-Product

We address a version of the Half-Product Problem and its restricted variant with a linear knapsack constraint. For these minimization problems of Boolean programming, we focus on the development of fully polynomial-time approximation schemes with running times that depend quadratically on the number of variables. Applications to various single machine scheduling problems are reported: minimizin...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:
  • Theor. Comput. Sci.

دوره 347  شماره 

صفحات  -

تاریخ انتشار 2005