Single Machine Scheduling with a Non-renewable Financial Resource
نویسندگان
چکیده
In this paper, we consider single machine scheduling problems with a non-renewable resource. This type of problems has not been intensively investigated in the literature so far. For several problems of this type with standard objective functions (namely the minimization of makespan, total tardiness, number of tardy jobs, total completion time and maximum lateness), we present some complexity results. Particular attention is given to the problem of minimizing total tardiness. In addition, for the so-called budget scheduling problem with minimizing the makespan, we present some properties of feasible schedules.
منابع مشابه
Single machine scheduling problems with financial resource constraints: Some complexity results and properties
We consider single machine scheduling problems with a non-renewable resource. This type of problems has not been intensively investigated in the literature so far. For several problems of this type with standard objective functions (namely the minimization of makespan, total tardiness, number of tardy jobs, total completion time and maximum lateness), we present some complexity results. Particu...
متن کاملApproximation schemes for single machine scheduling with non-renewable resource constraints
In this paper we discuss exact and approximation algorithms for scheduling a single machine with additional non-renewable resource constraints. Given the initial stock levels of some non-renewable resources (e.g. raw materials, fuel, money), and time points along with replenishment quantities, a set of resource consuming jobs has to be scheduled on the machine such that there are enough resourc...
متن کاملSplittable stochastic project scheduling with constrained renewable resource
This paper discusses the problem of allocation of constrained renewable resource to splittable activities of a single project. If the activities of stochastic projects can be split, these projects may be completed in shorter time when the available resource is constrained. It is assumed that the resource amount required to accom-plish each activity is a discrete quantity and deterministic. The ...
متن کاملSINGLE MACHINE DUE DATE ASSIGNMENT SCHEDULING PROBLEM WITH PRECEDENCE CONSTRAINTS AND CONTROLLABLE PROCESSING TIMES IN FUZZY ENVIRONMENT
In this paper, a due date assignment scheduling problem with precedence constraints and controllable processing times in uncertain environment is investigated, in which the basic processing time of each job is assumed to be the symmetric trapezoidal fuzzy number, and the linear resource consumption function is used.The objective is to minimize the crisp possibilistic mean (or expected) value of...
متن کاملApproximability of total weighted completion time with resource consuming jobs
In this paper we study an extension of the single machine scheduling problem with the total weighted completion time objective, where there is a single non-renewable resource consumed by the jobs, having an initial stock and some additional replenishments over time. We prove that this problem is NP-hard in the strong sense, and provide an FPTAS for a special case with two supply dates.
متن کامل