Optimization and Simulation of Resource Constrained Scheduling Problem Using Genetic Algorithm
نویسنده
چکیده
Due to the development of management idea and the scarcity of some resources, the lean management has become the necessary request to implement effective control of resource constrained project. Resource constrained project scheduling is the significant guarantee to attain the lean management. The resource constrained project scheduling problem (RCPSP), with the objective of minimizing project duration and with the precedence relations described by an activity-on-arrow (AOA) network, is formulated as a combination optimization problem and solved using the priority-based genetic algorithm (GA). The activity priorities are represented by chromosome and serial scheduling scheme (SSS) and parallel scheduling scheme (PSS) are developed and utilized to transform chromosome-represented priorities to an active schedule subject to the logic and resource constraints so that project duration corresponding to each chromosome can be evaluated. The overall framework of the GA for the RCPSP is developed and the basic components of the algorithm are designed. Simulation is provided so as to investigate the performance of the priority-based GA with SSS and PSS as decoding method, respectively. The optimal solution to a small-sized resource constrained benchmark instance is scheduled to find the shortest project duration. Comparative simulation results demonstrate not only the effectiveness and efficiency of GA with SSS or PSS as decoding methods in solution to RCPSP with precedence relation of activities diagramed as an AOA network but also the effect of different evolution parameter settings on solution quality of the problem.
منابع مشابه
A Multi-Mode Resource-Constrained Optimization of Time-Cost Trade-off Problems in Project Scheduling Using a Genetic Algorithm
In this paper, we present a genetic algorithm (GA) for optimization of a multi-mode resource constrained time cost trade off (MRCTCT) problem. The proposed GA, each activity has several operational modes and each mode identifies a possible executive time and cost of the activity. Beyond earlier studies on time-cost trade-off problem, in MRCTCT problem, resource requirements of each execution mo...
متن کاملAn Optimization via Simulation approach for the preemptive and non-preemptive multi-mode resource-constrained project scheduling problems
In this paper a novel modelling and solving method has been developed to address the so-called resource constrained project scheduling problem (RCPSP) where project tasks have multiple modes and also the preemption of activities are allowed. To solve this NP-hard problem, a new general optimization via simulation (OvS) approach has been developed which is the main contribution of the current re...
متن کاملAn Evolutionary Algorithm Based on a Hybrid Multi-Attribute Decision Making Method for the Multi-Mode Multi-Skilled Resource-constrained Project Scheduling Problem
This paper addresses the multi-mode multi-skilled resource-constrained project scheduling problem. Activities of real world projects often require more than one skill to be accomplished. Besides, in many real-world situations, the resources are multi-skilled workforces. In presence of multi-skilled resources, it is required to determine the combination of workforces assigned to each activity. H...
متن کاملA Bi-objective Pre-emption Multi-mode Resource Constrained Project Scheduling Problem with due Dates in the Activities
In this paper, a novel mathematical model for a preemption multi-mode multi-objective resource-constrained project scheduling problem with distinct due dates and positive and negative cash flows is presented. Although optimization of bi-objective problems with due dates is an essential feature of real projects, little effort has been made in studying the P-MMRCPSP while due dates are included i...
متن کاملA multi-objective resource-constrained optimization of time-cost trade-off problems in scheduling project
This paper presents a multi-objective resource-constrained project scheduling problem with positive and negative cash flows. The net present value (NPV) maximization and making span minimization are this study objectives. And since this problem is considered as complex optimization in NP-Hard context, we present a mathematical model for the given problem and solve three evolutionary algorithms;...
متن کاملA Genetic Algorithm and a Model for the Resource Constrained Project Scheduling Problem with Multiple Crushable Modes
Abstract: This paper presents an exact model and a genetic algorithm for the multi-mode resource constrained project scheduling problem with generalized precedence relations in which the duration of an activity is determined by the mode selection and the duration reduction (crashing) applied within the selected mode. All resources considered are renewable. The objective is to determine a mode, ...
متن کامل