Implicit shift scheduling with multiple breaks and work stretch duration restrictions
نویسندگان
چکیده
This paper considers a shift scheduling problem that includes different forms of flexibility in terms of shift starting times, break lengths and break placement. Two particular forms are studied: fractionable breaks and work stretch duration restrictions. For some instances the use of fractionable breaks results in considerable labor savings. In addition, imposing work stretch duration restrictions is a very convenient approach to place multiple breaks within a shift. In this context, we show the merits of using so-called forward and backward constraints to model work stretch duration restrictions. We also introduce a new formulation of the forward and backward constraints and demonstrate that it considerably reduces the density of the constraint matrix of both models.
منابع مشابه
Solution approaches to large shift scheduling problems
This paper considers large shift scheduling problems with different shift start times and lengths, fractionable breaks and work stretch duration restrictions. Two solution approaches are proposed to solve the problems over a multiple-day planning horizon. The first approach is based on a local branching strategy and the second one is based on a temporal decomposition of the problem. Local branc...
متن کاملSimultaneous Lot Sizing and Scheduling in a Flexible Flow Line
This paper breaks new ground by modelling lot sizing and scheduling in a flexible flow line (FFL) simultaneously instead of separately. This problem, called the ‘General Lot sizing and Scheduling Problem in a Flexible Flow Line’ (GLSP-FFL), optimizes the lot sizing and scheduling of multiple products at multiple stages, each stage having multiple machines in parallel. The objective is to satisf...
متن کاملA Genetic Algorithm and a Model for the Resource Constrained Project Scheduling Problem with Multiple Crushable Modes
Abstract: This paper presents an exact model and a genetic algorithm for the multi-mode resource constrained project scheduling problem with generalized precedence relations in which the duration of an activity is determined by the mode selection and the duration reduction (crashing) applied within the selected mode. All resources considered are renewable. The objective is to determine a mode, ...
متن کاملAn Optimal NPV Project Scheduling with Fixed Work Content and Payment on Milestones
Project scheduling Net present value We consider a project scheduling problem with permitted tardiness and discrete time/resource trade-offs under maximum net present value objective. In this problem, a project consists of a set of sequential phases such that each phase contains one or more sub-projects including activities interrelated by finish-start-type precedence relations with a t...
متن کاملA Nurse Scheduling Model under Real Life Constraints
Background and Objectives: In this paper, a real life nurse scheduling model is described based on the conditions in Iranian hospitals such as monthly shift rotation, consecutive morning and evening shifts and consecutive evening and night shift. Methods: The developed model considers both hospital constraints and nurses’ preferences. Hospital constraints include assigning adequate qualifie...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید
ثبت ناماگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید
ورودعنوان ژورنال:
- J. Scheduling
دوره 13 شماره
صفحات -
تاریخ انتشار 2010