Estimation of Setup Time for Machined Parts: Accounting for Work-holding Constraints Using a Vise
نویسندگان
چکیده
For machined parts, setup time is a major component of the total time required to manufacture a machined part from a stock. If the number of setups and hence setup time can be reduced, this will not only decrease the manufacturing time, but will also ensure better machining accuracy, require fewer work-holding devices and increase machine usage time. To achieve any improvement in setup time, rst we need to estimate the setup time accurately. In this paper we propose a methodology to estimate the setup time for machining prismatic parts in a three axis vertical machining center. We concurrently consider three major factors for estimating the number of setups, namely|the precedence constraints among machining operations, the feasibility of work holding using vise clamping, and the availability of datum faces for locating the workpiece on the machine table during machining on a 3 axis vertical machining center.
منابع مشابه
Budgetary Constraints and Idle Time Allocation in Common-Cycle Production with non-zero Setup Time
Economic lot size scheduling problem (ELSP) for a multi-product single machine system is a classical problem. This paper considers ELSP with budgetary constraint as an important aspect of such systems. In the real world situations the available funds for investment in inventory is limited. By adopting the common cycle time approach to ELSP, we obtain the optimal common cycle which minimizes the...
متن کاملManufacturing Processes Recognition of Machined Mechanical Parts using SVMs
This research studied using curvature and support vector machines (SVMs) to identify manufacturing processes of mechanical parts. Prior developments in computer vision and graphics has been able to recognize shapes of 2D and 3D models. This work contributes a technique for recognizing manufacturing processes from CAD models. Prismatic machined and cast-then-machined are two typical processes fo...
متن کاملUsing Markov Chain to Analyze Production Lines Systems with Layout Constraints
There are some problems with estimating the time required for the manufacturing process of products, especially when there is a variable serving time, like control stage. These problems will cause overestimation of process time. Layout constraints, reworking constraints and inflexible product schedule in multi product lines need a precise planning to reduce volume in particular situation of lin...
متن کاملMulti-Objective Unrelated Parallel Machines Scheduling with Sequence-Dependent Setup Times and Precedence Constraints
This paper presents a novel, multi-objective model of a parallel machines scheduling problem that minimizes the number of tardy jobs and total completion time of all jobs. In this model, machines are considered as unrelated parallel units with different speeds. In addition, there is some precedence, relating the jobs with non-identical due dates and their ready times. Sequence-dependent setup t...
متن کاملCharacterization of Am-Be neutron source based PGNAA setup using aqueous solutions of Chlorine and Boron
Background: A 5 Ci 241Am-Be radio isotopic neutron source-based prompt gamma neutron activation analysis (PGNAA) setup was designed for estimation of minimum detectable concentration (MDC) of elements in aqueous solutions. Materials and Methods: Performance variables related to PGNAA setup (source to sample distance, sample to detector distance and volume of water) were optimized experimentally...
متن کامل