Scheduling multiple factory cranes on a common track

نویسندگان

  • Ben Peterson
  • Iiro Harjunkoski
  • Samid Hoda
  • John N. Hooker
چکیده

We describe a heuristic algorithm for scheduling the movement of multiple factory cranes mounted on a common track. The cranes must complete a sequence of tasks at locations along the track without crossing paths, while adhering as closely as possible to a factory production schedule. The algorithm creates a decision tree of possible states of the crane system, which evolves over time as tasks are assigned and sequenced. By identifying and removing inferior states from the tree, the algorithm efficiently generates provably optimal or near-optimal crane schedules, depending on the complexity of the problem instance.

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Hybrid Model for Crane Scheduling

In this paper an hybrid model for scheduling crane movements is presented. Cranes sharing the same track are considered. Cranes can reach any location along the track performing loading or unloading operations. As cranes share the same track their movements are constrained to avoid over crossing; tasks deadlines and priorities are also considered. Scheduler output are the assignment of the task...

متن کامل

Quay Cranes and Yard Trucks Scheduling Problem at Container Terminals

A bi-objective mathematical model is developed to simultaneously consider the quay crane and yard truck scheduling problems at container terminals. Main real-world assumptions, such as quay cranes with non-crossing constraints, quay cranes’ safety margins and precedence constraints are considered in this model. This integrated approach leads to better efficiency and productivity at container te...

متن کامل

Multiple Yard Cranes Scheduling Model and Algorithm in the Mixture Storage Block

In order to improve the operating efficiency of mixture storage yard, the problem of multiple yard cranes scheduling (MYCS) must to be solved. The paper develops a multiple yard cranes scheduling MIP model in order to minimize the sum of trucks’ waiting cost and yard cranes’ moving cost. An important feature is that the future has to be taken into account: the interference between two yard cran...

متن کامل

An Integrated Model for Storage Location Assignment and Storage/Retrieval Scheduling in AS/RS system

An integrated optimization framework, including location assignment under grouping class-based storage policy and schedule of dual shuttle cranes, is offered by presenting a new optimization programming model. The objective functions, which are considered at this level, are the minimization of total costs and energy consumption. Scheduling of dual shuttle cranes among specified locations, which...

متن کامل

Crane Scheduling with Spatial Constraints

In this work, we examine port crane scheduling with spatial and separation constraints. Although common to most port operations, these constraints have not been previously studied. We assume that cranes cannot cross, there is a minimum distance between cranes and jobs cannot be done simultaneously. The objective is to find a crane-to-job matching which maximizes throughput under these constrain...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:
  • Computers & OR

دوره 48  شماره 

صفحات  -

تاریخ انتشار 2014