Multi-objective approaches for the open-pit mining operational planning problem

نویسندگان

  • Vitor Nazário Coelho
  • Marcone J. F. Souza
  • Igor Machado Coelho
  • Frederico G. Guimarães
  • Thibaut Lust
  • R. C. Cruz
چکیده

This work presents three multi-objective heuristic algorithms based on Two-phase Pareto Local Search with VNS (2PPLS-VNS), Multi-objective Variable Neighborhood Search (MOVNS) and Non-dominated Sorting Genetic Algorithm II (NSGA-II). The algorithms were applied to the open-pit-mining operational planning problem with dynamic truck allocation (OPMOP). Approximations to Pareto sets generated by the developed algorithms were compared considering the hypervolume and spacing metrics. Computational experiments have shown the superiority of the algorithms based on VNS methods, which were able to find better sets of non-dominated solutions, more diversified and with an improved convergence.

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Robust production scheduling in open-pit mining under uncertainty: a box counterpart approach

Open-Pit Production Scheduling (OPPS) problem focuses on determining a block sequencing and scheduling to maximize Net Present Value (NPV) of the venture under constraints. The scheduling model is critically sensitive to the economic value volatility of block, block weight, and operational capacity. In order to deal with the OPPS uncertainties, various approaches can be recommended. Robust opti...

متن کامل

An imperialist competitive algorithm for solving the production scheduling problem in open pit mine

Production scheduling (planning) of an open-pit mine is the procedure during which the rock blocks are assigned to different production periods in a way that the highest net present value of the project achieved subject to operational constraints. The paper introduces a new and computationally less expensive meta-heuristic technique known as imperialist competitive algorithm (ICA) for long-term...

متن کامل

Commodity price uncertainty propagation in open-pit mine production planning by Latin hypercube sampling method

Production planning of an open-pit mine is a procedure during which the rock blocks are assigned to different production periods in a way that leads to the highest net present value (NPV) subject to some operational and technical constraints. This process becomes much more complicated by incorporation of the uncertainty existing in the input parameters. The commodity price uncertainty is among ...

متن کامل

Resilient Decision Making in Open Pit Short-term Production Planning in Presence of Geologic Uncertainty

Short-term production plans are the basis for operational mine production schedules. They concentrate on making long-term mine plans operationally feasible. Furthermore, some variables such as ore grade and tonnage govern mine production systems and cause uncertainty in the supply of raw materials to the mills. Due to the quality variation of material, short-term production optimization is an u...

متن کامل

Cut-off Grade Optimization for Maximizing the Output Rate

In the open-pit mining, one of the first decisions that must be made in production planning stage, after completing the design of final pit limits, is determining of the processing plant cut-off grade. Since this grade has an essential effect on operations, choosing the optimum cut-off grade is of considerable importance. Different goals may be used for determining optimum cut-off grade. One of...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:
  • Electronic Notes in Discrete Mathematics

دوره 39  شماره 

صفحات  -

تاریخ انتشار 2012