Identification, and Visualisation of Construction Activities’ Workspace Conflicts Utilising 4d Cad/vr Tools
نویسندگان
چکیده
This work addresses the problem arising on all construction sites: the occurrence of workspace interference between construction activities. From a site space planning context, this problem can lead to an inevitable roadblock to the progress of the scheduled construction operations. In real situations, when the spatial congestions occur, they could reduce productivity of workers sharing the same workspace and may cause health and safety hazard issues. The aim of this paper is on presenting a computer-based method and developed tool to assist site managers in the assignment and identification of workspace conflicts. The author focuses on the concept of ‘visualising space competition’ between the construction activities. The concept is based on a unique representation of the dynamic behaviour of activity workspace in 3D space and time. An innovative computer-based tool dubbed PECASO (Patterns Execution and Critical Analysis of Site-space Organisation) has been developed. The emerging technique of 4D (3D + time) visualisation has been chosen to yield an interesting 4D space planning and visualisation tool. A multi-criteria function for measuring the severity of the workspace congestions is designed, embedding the spatial and schedule related criteria. The paper evaluates the PECASO approach in order to minimise the workspace congestions, using a real case study. The paper concludes that the PECASO approach reduces the number of competing workspaces and the conflicting volumes between occupied workspace, which in turn produces better assessment to the execution strategy for a given project schedule. The system proves to be a promising tool for 4D space planning; in that it introduces a new way of communicating the programme of work.
منابع مشابه
The Virtual Construction Site (vircon) Tools: an Industrial Evaluation
Visual 4D planning and scheduling techniques, that integrate 3D CAD models with the timing of construction activities, have proven to be more beneficial than traditional tools and are increasingly being employed on complex projects. In 4D models, project participants can effectively visualise and analyse problems regarding sequential, spatial, process conflicts and temporal aspects of construct...
متن کامل4d Construction Planning
Linear, 2-Dimensional and now 3-Dimensional visualization are the current tools used in the construction planning area. It is time for a new dimension to be added the dimension in which Planning Engineers are more interested. The dimension is TIME, which is now appropriate to add as the 4th dimension in construction planning. Current planning processes in the construction industry are still mai...
متن کاملConstruction schedule review in GIS with a navigable 3D animation of project activities
This paper presents a Geographic Information Systems (GIS) based navigable 3D animation of project activities to visualise and review a construction project schedule as an alternative to the existing 4D CAD tools. Most of the commercial tools allow planners to build a 4D model but lack features like generation and manipulation of developed 4D model on a single platform. To facilitate the 4D mod...
متن کاملGrid Cell-based Algorithm for Workspace Overlapping Analysis Considering Multiple Allocations of Construction Resources
When multiple workspaces for resources are allocated within a narrow work area, the constructability of work may deteriorate based on the conflicts that occur due to the mutual adjacency levels between the workspaces. In this situation, the identification of the workspace overlapping status is essential for establishing the optimized layout planning of workspaces. However, current 3D environmen...
متن کاملTowards Minimizing Space-time Conflicts between Site Activities Using Simple Genetic Algorithm - the Best Execution Strategy
Construction planners on every project are faced with a unique task of spatially organizing site activities with effective space utilization. This is a crucial planning exercise that if effectively rehearsed then can attribute to increased workers productivity, minimized construction accidents, improved delivery of project on time. One of the major issues in traditional project management tools...