A comparative study of heuristic algorithms on Economic Lot Scheduling Problem

نویسندگان

  • Asif S. Raza
  • Ali Akgunduz
چکیده

The Economic Lot Scheduling Problem (ELSP) has been well-researched for more than 40 years. As the ELSP has been generally seen as NP-hard, researchers have focused on the development of efficient heuristic approaches. In this paper, we consider the time-varying lot size approach to solve the ELSP. A computational study of the existing solution algorithms, Dobson’s heuristic, Hybrid Genetic algorithm, Neighborhood Search heuristics, Tabu Search and the newly proposed Simulated Annealing algorithm are presented. The reviewed methods are first tested on two well-known problems, those of Bomberger’s [Bomberger, E. E. (1966). A dynamic programming approach to a lot size scheduling problem. Management Science 12, 778–784] and Mallya’s [Mallya, R (1992). Multi-product scheduling on a single machine: A case study. OMEGA: International Journal of Management Science 20, 529–534] problems. We show the Simulated Annealing algorithm finds the best known solution to these problems. A similar comparison study is performed on various problem sets previously suggested in the literature. The results show that the Simulated Annealing algorithm outperforms Dobson’s heuristic, Hybrid Genetic algorithm and Neighborhood search heuristics on these problem sets. The Simulated Annealing algorithm also shows faster convergence than the best known Tabu Search algorithm, yet results in solutions of a similar quality. Finally, we report the results of the design of experiment study which compares the robustness of the mentioned meta-heuristic techniques. Crown copyright 2007 Published by Elsevier Ltd. All rights reserved.

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Finite Horizon Economic Lot and Delivery Scheduling Problem: Flexible Flow Lines with Unrelated Parallel Machines and Sequence Dependent Setups

This paper considers the economic lot and delivery scheduling problem in a two-echelon supply chains, where a single supplier produces multiple components on a flexible flow line (FFL) and delivers them directly to an assembly facility (AF). The objective is to determine a cyclic schedule that minimizes the sum of transportation, setup and inventory holding costs per unit time without shortage....

متن کامل

The Economic Lot Scheduling Problem in Flow Lines with Sequence-Dependent Setups

  The problem of lot sizing, sequencing and scheduling multiple products in flow line production systems has been studied by several authors. Almost all of the researches in this area assumed that setup times and costs are sequence –independent even though sequence dependent setups are common in practice. In this paper we present a new mixed integer non linear program (MINLP) and a heuristic me...

متن کامل

A heuristic approach for multi-stage sequence-dependent group scheduling problems

We present several heuristic algorithms based on tabu search for solving the multi-stage sequence-dependent group scheduling (SDGS) problem by considering minimization of makespan as the criterion. As the problem is recognized to be strongly NP-hard, several meta (tabu) search-based solution algorithms are developed to efficiently solve industry-size problem instances. Also, two different initi...

متن کامل

The Problem of Scheduling Several Products on A Single Facility with the Simulated Annealing Technique

This paper considers the Economic Lot Scheduling Problem, that is, the problem of scheduling several products on a single facility so as to minimize holding and setup costs. Combination of frequency and timing as well as production quantity make this problem Np-hard. A heuristic is developed to obtain a good solution to ELSP. The proposed heuristic makes use of the Simulated Annealing Technique...

متن کامل

The Problem of Scheduling Several Products on A Single Facility with the Simulated Annealing Technique

This paper considers the Economic Lot Scheduling Problem, that is, the problem of scheduling several products on a single facility so as to minimize holding and setup costs. Combination of frequency and timing as well as production quantity make this problem Np-hard. A heuristic is developed to obtain a good solution to ELSP. The proposed heuristic makes use of the Simulated Annealing Technique...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:
  • Computers & Industrial Engineering

دوره 55  شماره 

صفحات  -

تاریخ انتشار 2008