A Manufacturing Production Line with Service Interruptions

نویسنده

  • Nigel Thomas
چکیده

Jobs from a single Poisson input stream receive K independent stages of service, one at each stage in the pipeline. At stage i jobs are routed through one of the Ni available nodes, modelled as M/M/1 queues. These nodes are subject to random failure and repairs which leave their corresponding queues intact, but may affect the routeing of jobs arriving at that stage during the subsequent repair period. Two possible approximate solutions for the marginal queue size distributions are obtained using Marie’s method and spectral expansion. Approximations are compared with solutions obtained by simulation techniques. Two routeing strategies are considered, fixed and selective, and the relative accuracy of the approximate solutions and predicted optimal routeing vectors are discussed. This method is obviously applicable to other, more general, network models and it is therefore interesting to observe the accuracy of the approximations and predictions of an optimal routeing vector. Models such as this have traditionally been studied through simulation. However, an exceedingly long runtime is needed to obtain steady state results, especially when failures are rare and repairs are slow. The method presented here gives a very rapid response and as such is clearly of great practical benefit, especially when optimising the routing of jobs.

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Setting Real Time WIP Levels in Production Lines

(No page numberings) Abstract— A new algorithm is developed for setting WIP level in production lines. It is a pull policy that determines when to authorize a job to be processed. Dynamic information in the system such as machine failures and repairs, and demand variations are taken into consideration to provide an efficient method to dynamically determine the WIP level. Two types of production...

متن کامل

Using Markov Chain to Analyze Production Lines Systems with Layout Constraints

There are some problems with estimating the time required for the manufacturing process of products, especially when there is a variable serving time, like control stage. These problems will cause overestimation of process time. Layout constraints, reworking constraints and inflexible product schedule in multi product lines need a precise planning to reduce volume in particular situation of lin...

متن کامل

Study on implementation of one-piece lean line design using simulation techniques: A practical approach

This paper discusses the simulation study carried out for proposing one-piece lean line layout with features of Lean Manufacturing. The lean initiatives that can be addressed are, introducing Kanban replenishment sys-tem, better work-in-process, changing the layout, visual management techniques, standardized work for the re-duction of cycle time, number of workers, number of setups. To improve ...

متن کامل

Cloud manufacturing system

Cloud manufacturing is defined as a relationship between the consumer and a flexible array of production services, managed by an intervening architecture that can match service providers to product and manufacturing processes Cloud manufacturing definitions typically make explicit or imply three groups of actors: consumers, who request and use cloud manufacturing processes; application provider...

متن کامل

Study and Implementation of Lean Manufacturing in a Garment Manufacturing Company: Bangladesh Perspective

Lean manufacturing is a systematic approach to identifying and eliminating wastes (non-value added activities) through continuous improvement by conveying the product at the pull of the customer in pursuit of production. In a more basic term, more value with less work. Since lean manufacturing eliminates many of the problems associated with poor production scheduling and line balancing, lean ma...

متن کامل

Appointment Scheduling Under Patient No-Shows and Service Interruptions

We consider an appointment-based service system (for example, an outpatient clinic) for which appointments need to be scheduled before the service session starts. Patients with scheduled appointments may or may not show-up for their appointments. The service of scheduled patients can be interrupted by emergency requests that have a higher priority. We develop a framework which can be utilized i...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:

دوره   شماره 

صفحات  -

تاریخ انتشار 1998