Patient- and surgeon-adjusted control charts for monitoring performance

نویسندگان

  • Mahiben Maruthappu
  • Matthew J Carty
  • Stuart R Lipsitz
  • John Wright
  • Dennis Orgill
  • Antoine Duclos
چکیده

OBJECTIVES To determine whether an innovative graphical tool for accurate measurement of individual surgeon performance metrics, adjusted for both surgeon-specific and patient-specific factors, significantly alters interpretation of performance data. DESIGN Retrospective analysis of all total knee replacements (TKRs) conducted at the host institution between 1996 and 2009. The database was randomly divided into training and testing datasets. Using multivariate generalised estimating equation regression models, the training dataset enabled generation of patient-risk and surgeon-experience adjustment factors. To simulate prospective monitoring of individual surgeon outcomes, the testing dataset was mapped on control charts. Weighted κ statistics were calculated to measure the agreement between patient-risk adjusted and fully adjusted control charts. SETTING Tertiary care academic hospital. PARTICIPANTS All patients undergoing TKR at the host institution 1996-2009. MAIN OUTCOME MEASURE Operative efficiency. RESULTS 5313 procedures were analysed. Adjusted control charts were generated using a training dataset comprising 3756 procedures performed by 13 surgeons. The operative time gradually declined by 121 min with 25 years of experience (p<0.0001). Charts were tested by monitoring four other surgeons, performing an average of 389 procedures each. Adjustment for surgeon experience significantly altered the interpretation of operative efficiency (κ=0.29 (95% CI 0.11 to 0.47)), and enhanced assessment of a surgeon's improvement or diminishment in efficiency over time. Specifically, experience adjustment inverted the interpretation of surgeon efficiency from above average to below average, or from improving to declining performance. CONCLUSIONS Adjustment for surgeon experience is necessary for accurate interpretation of metrics over the course of a surgeon's career. Patient-adjusted and surgeon-adjusted control charts provide an accurate method of monitoring individual operative efficiency.

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Risk-adjusted control charts based on LR-fuzzy data

Control charts are widely used in industrial processes as well as in health sciences and particularly for monitoring the performance of cardiac surgeon or a group of surgeons based on the preoperative risk of patients. Since the preoperative risk is a vague and nonprecise variable and the anesthesiologists after checking how many risk factors a patient has, determine the risk of mortality befor...

متن کامل

A risk adjusted self-starting Bernoulli CUSUM control chart with dynamic probability control limits

Usually, in monitoring schemes the nominal value of the process parameter is assumed known. However, this assumption is violated owing to costly sampling and lack of data particularly in healthcare systems. On the other hand, applying a fixed control limit for the risk-adjusted Bernoulli chart causes to a variable in-control average run length performance for patient populations with dissimilar...

متن کامل

Phase I Risk-Adjusted Control Charts for Monitoring Surgical Performance by Considering Categorical Covariates

In recent years risk-adjusted control charts have been increasingly studied for monitoring surgical outcomes by accounting for patients’ health conditions prior to surgery. However, most existing research focuses on phase II monitoring, and very little work has been done on phase I control of surgical outcomes. In this paper, a general phase I risk-adjusted control chart is proposed for monitor...

متن کامل

Using Regression based Control Limits and Probability Mixture Models for Monitoring Customer Behavior

In order to achieve the maximum flexibility in adaptation to ever changing customer’s expectations in customer relationship management, appropriate measures of customer behavior should be continually monitored. To this end, control charts adjusted for buyer’s/visitor’s prior intention to repurchase or visit again are suitable means taking into account the heterogeneity across customers. In the ...

متن کامل

The Effect of Estimation Error on Risk-adjusted Bernoulli GEWMA Control Chart in Multistage Healthcare Processes

Background and objectives: Risk-adjusted Bernoulli control chart is one of the main tools for monitoring multistage healthcare processes to achieve higher performance and effectiveness in healthcare settings. Using parameter estimates can lead to significantly deteriorate chart performance. However, so far, the effect of estimation error on this chart in which healthcare ...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:

دوره 4  شماره 

صفحات  -

تاریخ انتشار 2014