OTC 8196 Prevention of Severe Slugging in the Dunbar 16“ Multiphase Pic)eline
نویسنده
چکیده
The occurrence of the severe slugging phenomenon in multiphase pipelines can cause serious and troublesome operational problems within the receiving process facilities. This paper describes: the pipeline operability studies on the Dunbar to Alwyn multiphase pipeline regarding riser-induced severe slugging; the control scheme selected to prevent this phenomenon; and the subsequent operating experience. The pipeline operability studies involving dynamic simulations concluded that riser-induced severe slugging could occur over a wide range of production rates, in particular when the ElIon gas is unavailable. The challenge for TOTAL was to develop an operating strategy and a control scheme in order to eliminate severe slugging and operate the pipeline without significant process upset. An automatic control scheme was selected which offered a cost effective solution and ensured the safety of the existing process installations. Its originality was thar it was based on a Riser Base Pressure Control. Since the initial start-up in December 1994, this selected scheme has proven to be successful and has enabled the pipeline operations in the riser-induced severe slugging region to be csrried out without any difficulty. Introduction The Dunbar field is situated in the UK sector of the northern North Sea, approximately 22 km to the South of Alwyn North field which has been operated since the end of 1987 (Fig. 1 and Fig. 2). The recent development of the Dunbar field and its satellite ElIon comprises a production platform linked to the Alwyn North platform by a 16“ multiphase pipeline (Fig. 3). The gas from ElIon (Subsea wells) and the oil and gas from Dunbsr are co-mingled and the overall well-fluid production is routed without separation to the Alwyn North processing and treatment facilities. The Dunbar 16“ Multiphase Pipeline has been designed to export the Dunbar and Ellen production to Alwyn North (NAB platform) at a maximum flow of 49000 BOPD and 7.9 MMSCMD. Over a wide range of production rates, in particular when the ElIon gas is unavailable, the pipeline operation is in an unstable region where riserinduced severe shrggi ng occurs. The purpose of this document is : 1. to give a short description of the flow regimes predicted in the DUNBAR 16” Multiphase Pipeline and in particukw of the severe slugging phenomenon. 2, to present the operating strategy and the contiol system developed by TOTAL in order to prevent severe slugging and to operate the pipeline without occurrence of significant process upsets. 3. and to give a feed-back of the pipeline operation at low flow rates, 1. Flow regimes and severe slugging The pipeline profile of the Dunbar 16“ pipeline is represented in Fig. 4. The flow regime map for this pipeline operated at a NAB riser-base pressure of 74 barg is given in Fig. 5. This map was based on the results of dynamic simulations performed with the OLGA pipeline software. The different pipeline flow regimes that can be encountered in the operations of the Dunbar pipeline me: stable flow, hydrodynamic slug flow at high flowrates and riser-induced severe slugging flow at low flowrates. The Dunbar Pipeline flow regime map shows that hydrodynamic slugging is predicted well above the maximum design capacity of the pipeline and is therefore not a concern for the receiving process facilities, On the other hand it shows that the Dunbar 16” Multiphase Pipeline is subject to riser-induced severe shrgging over a wide range of production rates, in particular when the ElIon gas is unavailable. The severe slugging phenomenon occurs in multiphase pipelines at low flow and low GOR production when the gas rate is insufficient to continuously lift liquid up the riser. It is not the object of this document to go into details regarding the severe
منابع مشابه
Simplified Dynamical Models for Control of Severe Slugging in Multiphase Risers
In order to prevent the severe slugging flow regime in multiphase transport pipelines, active feedback control is the recommended solution. Instead of elaborated models such as CFD and OLGA models, a simple dynamical model with few state variables is required in a model-based control system. We propose a new simplified dynamical model for severe slugging flow in pipeline-riser systems. The prop...
متن کاملInvestigation of Slug Suppression System in Deepwater Scenario
In pipeline-riser systems, pressure fluctuations which result from the formation of large liquid slugs and gas surges due to operational changes or low mass flow rate from production wells and the profile of pipeline-riser systems often lead to trips at the inlet of the separator; and thereby, the problem causes a a loss of the production.In this study, on a sample deep-water oil field off the ...
متن کاملA Machine Learning Approach for Virtual Flow Metering and Forecasting
We are concerned with robust and accurate forecasting of multiphase flow rates in wells and pipelines during oil and gas production. In practice, the possibility to physically measure the rates is often limited; besides, it is desirable to estimate future values of multiphase rates based on the previous behavior of the system. In this work, we demonstrate that a Long Short-Term Memory (LSTM) re...
متن کاملSimplified dynamic models for control of riser slugging in offshore oil production
Elaborated models such as those used for simulation purposes (e.g. OLGA simulator) cannot be used for model-based control design. The focus of this paper is on deriving simple dynamical models with few state variables that capture the essential behaviour for control. We propose a new simplified dynamic model for severe slugging flow in pipeline-riser systems. The proposed model, together with f...
متن کاملInduction and prevention of severe hyperammonemia in the spfash mouse model of ornithine transcarbamylase deficiency using shRNA and rAAV-mediated gene delivery.
Urea cycle defects presenting early in life with hyperammonemia remain difficult to treat and commonly necessitate liver transplantation. Gene therapy has the potential to prevent hyperammonemic episodes while awaiting liver transplantation, and possibly also to avert the need for transplantation altogether. Ornithine transcarbamylase (OTC) deficiency, the most prevalent urea cycle disorder, pr...
متن کامل