Use of Short-Term (5-Minute) and Long- Term (18-Hour) Leaching Tests to Characterize, Fingerprint, and Rank Mine- Waste Material from Historical Mines in the Deer Creek, Snake River, and Clear Creek Watersheds in and around the Montezuma Mining District, Colorado

نویسنده

  • Philip L. Hageman
چکیده

Precipitation-induced runoff from historical mine-waste located adjacent to the headwaters of the Snake River, Deer Creek, Saints John Creek, Grizzly Gulch, Stevens Gulch, and Leavenworth Creek contributes to the degradation of water quality in these streams. Because historical mine-waste piles have had long-term exposure to the atmosphere, it is surmised that runoff from these piles, induced by meteorological events such as cloudbursts and snowmelt, may cause mobility of acid and metals into a watershed due to dissolution of soluble minerals. For this study, 13 mine-waste composite samples from various mine-wastes in these drainage basins were leached using both a short-term and a long-term leach test. Analytical results from this combination of leach tests are tools that allow the investigator to quantify (fingerprint) which geochemical components could be expected in runoff from these piles if they were leached by a cloudburst (5-minute leach test), as well as what the “worst-case” geochemical profile would look like if the material were subject to extended leaching and breakdown of the mine-waste material (18hour leach test). Also, this combination of leach tests allows the geoscientist the ability to see geochemical changes in the mine-waste leachate over time. That is, does the leachate become more or less acidic over time; does the specific conductance increase or decrease; and are there changes in the concentrations of major or trace elements? Further, use of a ranking scheme described herein will aid in prediction of which historical mine-waste piles have the greatest potential for impact on a watershed should runoff occur. Because of long-term weathering of these historical mine-waste piles, geochemical profiles, leachate time-trends, and relative ranking of the mine-wastes produced from analysis of the leachates are Hageman_SIR_2508.doc 1 7/21/2004 2:50 PM indicative of how the mine-waste piles can be expected to act in the environment and may help to identify the “bad actors”—this may aid in understanding the reasons for water-quality differences between the drainages.

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Resilient Decision Making in Open Pit Short-term Production Planning in Presence of Geologic Uncertainty

Short-term production plans are the basis for operational mine production schedules. They concentrate on making long-term mine plans operationally feasible. Furthermore, some variables such as ore grade and tonnage govern mine production systems and cause uncertainty in the supply of raw materials to the mills. Due to the quality variation of material, short-term production optimization is an u...

متن کامل

Ancient Iranian Earthquakes: Chehr-Abad Salt Mine

Modern plate tectonic theory, the development of earthquake prediction and the mitigation of earthquake hazards are based on the study of earthquakes during the twentieth century. Investigation of earthquakes over a much longer period, although in no way invalidating the global importance of plate tectonics, shows that patterns of seismic activity do change with time and that areas of intense s...

متن کامل

Analysis and Forecast of Mining Accidents in Pakistan

In the mining sector, the barrier to obtain an efficient safety management system is the unavailability of future information regarding the accidents. This paper aims to use the auto-regressive integrated moving average (ARIMA) model, for the first time, to evaluate the underlying causes that affect the safety management system corresponding to the number of accidents and fatalities in the surf...

متن کامل

Metal extraction competence of plants on waste dumps of magnesite mine, Salem District, South India

An ex-situ experiment to assess the metal extractive potential of fourteen agriculture plants (Vigna unguiculata, Gossypium hirsutum, Jatropha curcas, etc.) was conducted on Magnesite mines which had above permissible levels of Cadmium and Lead. There was no much difference in the total chlorophyll a and b, carbohydrate and protein contents in the plants grown in the mining soil and adjacent co...

متن کامل

A Chance Constrained Integer Programming Model for Open Pit Long-Term Production Planning

The mine production planning defines a sequence of block extraction to obtain the highest NPV under a number of constraints. Mathematical programming has become a widespread approach to optimize production planning, for open pit mines since the 1960s. However, the previous and existing models are found to be limited in their ability to explicitly incorporate the ore grade uncertainty into the p...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:

دوره   شماره 

صفحات  -

تاریخ انتشار 2004