A Three-Stage Matheuristic for the Capacitated Multi-Commodity Fixed- Cost Network Design with Design- Balance Constraints
نویسندگان
چکیده
This paper proposes a three-stage matheuristic solution strategy for the capacitated multi-commodity fixed-cost network design problem with design-balance constraints. The proposed matheuristic combines exact and neighbourhood-based methods. The proposed tabu-search and path-relinking meta-heuristics cooperate to generate as many feasible solutions as possible. The two meta-heuristics incorporate new neighbourhoods, and computationally-efficient exploration procedures. The feasible solutions generated by the two procedures are then used to identify an appropriate part of the solution space where an exact solver intensifies the search. Computational experiments on benchmark instances show that the proposed algorithm finds good solutions to large-scale problems in a reasonable amount of time.
منابع مشابه
A three-phase matheuristic for capacitated multi-commodity fixed-cost network design with design-balance constraints
This paper proposes a three-phase matheuristic solution strategy for the capacitated multi-commodity fixed-cost network design problem with design-balance constraints. The proposed matheuristic combines exact and neighbourhood-based methods. Tabu search and restricted path relinking meta-heuristics cooperate to generate as many feasible solutions as possible. The two meta-heuristics incorporate...
متن کاملACO-Based Neighborhoods for Fixed-charge Capacitated Multi-commodity Network Design Problem
The fixed-charge Capacitated Multi-commodity Network Design (CMND) is a well-known problem of both practical and theoretical significance. Network design models represent a wide variety of planning and operation management issues in transportation telecommunication, logistics, production and distribution. In this paper, Ant Colony Optimization (ACO) based neighborhoods are proposed for CMND pro...
متن کاملModel and Solution Approach for Multi objective-multi commodity Capacitated Arc Routing Problem with Fuzzy Demand
The capacitated arc routing problem (CARP) is one of the most important routing problems with many applications in real world situations. In some real applications such as urban waste collection and etc., decision makers have to consider more than one objective and investigate the problem under uncertain situations where required edges have demand for more than one type of commodity. So, in thi...
متن کاملA Hybrid Simulated Annealing and Simplex Method for Fixed-Cost Capacitated Multicommodity Network Design
The fixed-cost Capacitated Multicommodity Network Design (CMND) problem is a well known NP-hard problem. This paper presents a matheuristic algorithm combining Simulated Annealing (SA) metaheuristic and Simplex method for CMND problem. In the proposed algorithm, a binary array is considered as solution representation and the SA algorithm manages open and closed arcs. Several strategies for open...
متن کاملReliable Designing of Capacitated Logistics Network with Multi Configuration Structure under Disruptions: A Hybrid Heuristic Based Sample Average Approximation Algorithm
We consider the reliable multi configuration capacitated logistics network design problem (RMCLNDP) with system disruptions, concerned with facilities locating, transportation links constructing, and also allocating their limited capacities to the customers in order to satisfy their demands with a minimum expected total cost (including locating costs, link constructing costs, as well as expecte...
متن کامل