New measures and procedures to manage financial risk with applications to the planning of gas commercialization in Asia

نویسندگان

  • Ahmed Aseeri
  • Miguel J. Bagajewicz
چکیده

This paper presents some new concepts and procedures for financial risk management. To complement the use of value at risk a new concept, upside potential or opportunity value as means to weigh opportunity loss versus risk reduction as well as an area ratio are introduced and discussed. Upper and lower bounds for risk curves corresponding to the optimal stochastic solution are developed, the application of the sampling average algorithm, one scenario at a time, is analyzed, and the relation between two-stage stochastic models that manage r p i t m ©

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Developing a fuzzy expert system to predict technology commercialization success

A majority of efforts in terms of technology commercialization have failed; however, the issue of commercialization and its high importance are agreed upon by policymakers, entrepreneurs, and researchers. This shows the high complexity of the commercialization process. One of the main solutions to overcome the commercialization problems is to predict the success of technology commercialization ...

متن کامل

Developing a Framework for Accounting and Financial Management Procedures of Joint Operating Agreements (JOAs) in Iran's oil and gas industry

Regarding the contingency theory, the purpose of this research is to identify factors affecting the development of accounting and financial management procedures for joint operating agreements in Iran's oil and gas industry. To this end, at first, some partial factors were identified through deep study of theoretical foundations. Subsequently, in order to identify environmental factors, a semi-...

متن کامل

A New Multi-objective Model for Multi-mode Project Planning with Risk

The purpose of this problem is to choose a set of project activities for crashing, in a way that the expected project time, cost and risk are minimized and the expected quality is maximized. In this problem, each project activity can be performed with a specific executive mode. Each executive mode is characterized with four measures, namely the expected time, cost, quality and risk. In this pap...

متن کامل

The assessment of safety and health risk using multi-criteria evaluation technique and TOPSIS method in Ilam gas refinery

Background and Objective: This study was designed to assess the safety and health risk in Ilam gas refinery and evaluation of TOPSIS method performance in risk assessment. Materials and Methods:  After identifying 955 hazards case, the risks were ranked separately in the health and safety sectors using criteria such as exposure level, severity and probability of the occurrence and use TOPSIS m...

متن کامل

Runoff Production Potential Zoning Using Fuzzy GIS-MCDA Models (Case Study: Tajan River Basin)

Because in Iran, flood phenomenon has the highest financial losses and death tolls among the natural disasters, thus reducing the damage caused by it has been considered for a long time and it is regarded essential. The most urgent action to deal with this natural disaster is to make preparations and take measures to reduce its harmful effects. One of the basic measures in this regard is the re...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:
  • Computers & Chemical Engineering

دوره 28  شماره 

صفحات  -

تاریخ انتشار 2004