Dynamic Planning of Construction Activities Using Hybrid Simulation
نویسندگان
چکیده
Traditional planning methods such as CPM and PERT have been useful tools to manage construction projects. However, the underlying model of these traditional methods often seems to fail to represent real projects as they tend to assume no interrelationship between project components. In reality, project components have complex dynamic feedback process that requires modeling of inherent uncertainty in the execution of these projects. Nevertheless, this dynamic nature and uncertainty have not been explicitly addressed by traditional planning methods. Project failure can be attributed to poor representation of the inner and outer aspects of operations that are responsible for project dynamics. Uncontrollable external forces are often cited but the real cause may be internal such as the feedback process among components of the project. An alternative perspective is offered in this paper through system dynamics (SD) that accounts for the feedback process and discrete event simulation (DES) for modeling the uncertainty. The proposed method utilizes SD method for modeling project dynamics and DES method coupled with CPM network for operational details and uncertainty, respectively. A case study that involves preparing engineering drawings in a design office is used to demonstrate the use of the developed method and to highlight its capabilities. Modeling the dynamic dimension is expected to enhance planning and scheduling of construction operations and to provide a better understanding of the impact of various internal and external factors on project schedule and productivity performance.
منابع مشابه
Safety Risks Impacts Analysis on Construction Project Objectives Using a Hybrid Model of Fuzzy Expert System and Latin Hyper Cube Sampling
Background and aims: The construction industry has a high rate of fatal or nonfatal injuries and all around the world which remains one of the most dangerous occupations till now. Since project safety and measuring danger in the construction industry is a crucial subject, so this study aimed to measure the impacts of safety risks on the time and cost objectives of project using a hybrid method ...
متن کاملA New Dynamic Random Fuzzy DEA Model to Predict Performance of Decision Making Units
Data envelopment analysis (DEA) is a methodology for measuring the relative efficiency of decision making units (DMUs) which ‎consume the same types of inputs and producing the same types of outputs. Believing that future planning and predicting the ‎efficiency are very important for DMUs, this paper first presents a new dynamic random fuzzy DEA model (DRF-DEA) with ‎common weights (using...
متن کاملConcurrent control on resource planning and revenue/expenditure estimation in large-scale shell material embankment projects management using discrete-event simulation
Resource planning in large-scale construction projects has been a complicated management issue requiring mechanisms to facilitate decision making for managers. In the present study, a computer-aided simulation model is developed based on concurrent control of resources and revenue/expenditure. The proposed method responds to the demand of resource management and scheduling in shell material emb...
متن کاملSimulation of Pore Water Pressure in the Body of Earthen Dams during Construction Using Combining Meta-Heuristic Algorithms and ANFIS
Accurate prediction of pore water pressure in the body of earth dams during construction with accurate methods is one of the most important components in managing the stability of earth dams. The main objective of this research is to develop hybrid models based on fuzzy neural inference systems and meta-heuristic optimization algorithms. In this regard, the fuzzy neural inference system and opt...
متن کاملDynamic Simulation of Construction Activities Using Real Time Field Data Collection
Simulation has been evolved to facilitate the process of designing, analyzing, planning and controlling of engineering processes and to aid decision-makers in setting long term project goals. Computer simulation tools thus provide an opportunity for engineers to create models that represent activities, resources, and the environment under which a project is taking place. However, such models wo...
متن کامل