Time-series and risk-adjusted control charts
نویسندگان
چکیده
Presentation There are several statistical process control (SPC) methods used in industry that can be applied in healthcare. However, as noted in the earlier discussion by Toulany et al. regarding quasi-experimental designs for quality improvement research, several considerations must be taken into account when adapting these methods for the complex, high-risk healthcare arena. Industrial methods should be adjusted for (a) heterogeneity at the patient level, including illness type, individualized care, and demographics, (b) heterogeneity at the process level, including geographical and longitudinal clinical care variation, (c) lack of pre-existing standards of comparison for new products or processes, and (d) the critical difference between statistical variation and acceptable clinical risk. Potential methods for successful adaptation of industrial SPC methods for healthcare monitoring and improvement include (a) converting periodic data into cumulative charts to increase detection of trends and (b) addressing heterogeneity through risk adjustment, using a prediction model or propensity score matching. These adjustments tend to inflate Type I errors, however, due to repeated measurements. Thus, the Sequential Probability Ratio Testing (SPRT) method may be of particular use [1]. SPRT uses the more commonly available retrospective control data, accounts for repeated measurements, utilizes risk adjustment, and incorporates both alpha and beta error into the formal framework [2,3]. The upper control limit is the desired odds ratio, as determined by the hypothesis. Industrial SPC methods assume process homogeneity and that the outcome rate from the population establishes the threshold for detecting changes in the process. Using these techniques to analyze processes in healthcare often requires addressing the risk and complexities inherent in healthcare in order to obtain meaningful results. As with any data-driven project, the clinical question and limitations of the available data drive the selection of the patient cohort, SPC method, risk adjustment framework, alerting thresholds, and the interpretation of clinical significance. However, regardless of the SPC method used and the risk-adjustment framework, it is important to realize that performance of the risk adjustment model drives the overall result; thus understanding the strengths and weaknesses of each particular model is critical to clinical interpretations. In addition, detecting adverse outcomes over a long period requires recalibrating the model over time to adjust for systematic changes in clinical care. Finally, all signals detected using these methods require root cause analyses (RCA) and sensitivity analyses as they are hypothesis-generating, not confirming.
منابع مشابه
Bayesian Estimation of Change Point in Phase One Risk Adjusted Control Charts
Use of risk adjusted control charts for monitoring patients’ surgical outcomes is now popular.These charts are developed based on considering the patient’s pre-operation risks. Change point detection is a crucial problem in statistical process control (SPC).It helpsthe managers toanalyzeroot causes of out-of-control conditions more effectively. Since the control chart signals do not necessarily...
متن کاملRisk-adjusted control charts based on LR-fuzzy data
Control charts are widely used in industrial processes as well as in health sciences and particularly for monitoring the performance of cardiac surgeon or a group of surgeons based on the preoperative risk of patients. Since the preoperative risk is a vague and nonprecise variable and the anesthesiologists after checking how many risk factors a patient has, determine the risk of mortality befor...
متن کاملA risk adjusted self-starting Bernoulli CUSUM control chart with dynamic probability control limits
Usually, in monitoring schemes the nominal value of the process parameter is assumed known. However, this assumption is violated owing to costly sampling and lack of data particularly in healthcare systems. On the other hand, applying a fixed control limit for the risk-adjusted Bernoulli chart causes to a variable in-control average run length performance for patient populations with dissimilar...
متن کاملThe Effect of Estimation Error on Risk-adjusted Bernoulli GEWMA Control Chart in Multistage Healthcare Processes
Background and objectives: Risk-adjusted Bernoulli control chart is one of the main tools for monitoring multistage healthcare processes to achieve higher performance and effectiveness in healthcare settings. Using parameter estimates can lead to significantly deteriorate chart performance. However, so far, the effect of estimation error on this chart in which healthcare ...
متن کاملPatient- and surgeon-adjusted control charts for monitoring performance
OBJECTIVES To determine whether an innovative graphical tool for accurate measurement of individual surgeon performance metrics, adjusted for both surgeon-specific and patient-specific factors, significantly alters interpretation of performance data. DESIGN Retrospective analysis of all total knee replacements (TKRs) conducted at the host institution between 1996 and 2009. The database was ra...
متن کاملUsing Regression based Control Limits and Probability Mixture Models for Monitoring Customer Behavior
In order to achieve the maximum flexibility in adaptation to ever changing customer’s expectations in customer relationship management, appropriate measures of customer behavior should be continually monitored. To this end, control charts adjusted for buyer’s/visitor’s prior intention to repurchase or visit again are suitable means taking into account the heterogeneity across customers. In the ...
متن کامل