Melt Scheduling to Trade Off Material Waste and Shipping Performance
نویسندگان
چکیده
The ingot formation or “melt” process is the first step in many steel making operations. This process involves melting steel and alloys for desired chemical composition, then pouring it into a variety of ingot molds. Complex technological and resource constraints can make the planning and scheduling of such processes extremely challenging. In this paper, we report our experience in developing solution methods for this “melt scheduling” problem at BethForge, a division of the Bethlehem Steel Corporation, and a manufacturer of custom-made heavy steel forgings. We describe the main issues associated with generic melt scheduling problem as well as constraints that are specific to BethForge. The problem at BethForge is particularly challenging due to the need to keep the ingot at a high temperature before forging, their high product variety, and the need to consider trade-offs between two conflicting objectives. We first formulate the base melt scheduling problem as a mixed integer program. We then decouple the scheduling decisions into two levels and develop a local search algorithm based on Storer and Wu’s problem space neighborhood. Our aim is to generate a family of efficient schedules that allow decision makers to balance the tradeoff between two criteria. Computational experiments are performed using data from BethForge. The melt scheduling procedure developed herein has been implemented and installed at BethForge. It made fundamental improvement in their melt scheduling process.
منابع مشابه
A multi-objective resource-constrained optimization of time-cost trade-off problems in scheduling project
This paper presents a multi-objective resource-constrained project scheduling problem with positive and negative cash flows. The net present value (NPV) maximization and making span minimization are this study objectives. And since this problem is considered as complex optimization in NP-Hard context, we present a mathematical model for the given problem and solve three evolutionary algorithms;...
متن کاملA Multi-Mode Resource-Constrained Optimization of Time-Cost Trade-off Problems in Project Scheduling Using a Genetic Algorithm
In this paper, we present a genetic algorithm (GA) for optimization of a multi-mode resource constrained time cost trade off (MRCTCT) problem. The proposed GA, each activity has several operational modes and each mode identifies a possible executive time and cost of the activity. Beyond earlier studies on time-cost trade-off problem, in MRCTCT problem, resource requirements of each execution mo...
متن کاملA JOINT DUTY CYCLE SCHEDULING AND ENERGY AWARE ROUTING APPROACH BASED ON EVOLUTIONARY GAME FOR WIRELESS SENSOR NETWORKS
Network throughput and energy conservation are two conflicting important performance metrics for wireless sensor networks. Since these two objectives are in conflict with each other, it is difficult to achieve them simultaneously. In this paper, a joint duty cycle scheduling and energy aware routing approach is proposed based on evolutionary game theory which is called DREG. Making a trade-off ...
متن کاملAN EFFECTIVE METHOD FOR SIMULTANEOUSLY CONSIDERING TIME-COST TRADE-OFF AND CONSTRAINT RESOURCE SCHEDULING USING NONLINEAR INTEGER FRAMEWORK
Critical Path Method (CPM) is one of the most popular techniques used by construction practitioners for construction project scheduling since the 1950s. Despite its popularity, CPM has a major shortcoming, as it is schedule based on two impractical acceptance that the project deadline is not bounded and that resources are unlimited. The analytical competency and computing capability of CPM thus...
متن کاملPresenting a Multi-Objective Mathematical Model for Time-Cost trade off Problem Considering Time Value of Money and Solve it by MOPSO Algorithm
The time - cost tradeoff problem is one of the most critical issues in the project scheduling field and so far, a lot of research has been done with a variety of quantitative and qualitative approaches on this subject. In this research, we intend to provide a two - objective mathematical model which balances crash and delay for activities. So that it provides the right tools for decision makers...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید
ثبت ناماگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید
ورودعنوان ژورنال:
- Operations Research
دوره 49 شماره
صفحات -
تاریخ انتشار 2001