Solution approaches to large shift scheduling problems
نویسندگان
چکیده
This paper considers large shift scheduling problems with different shift start times and lengths, fractionable breaks and work stretch duration restrictions. Two solution approaches are proposed to solve the problems over a multiple-day planning horizon. The first approach is based on a local branching strategy and the second one is based on a temporal decomposition of the problem. Local branching is very efficient in finding good feasible solutions when compared to a classical branch-and-bound procedure. However, the decomposition approach has the advantage of yielding feasible solutions in short computing times, even for difficult instances.
منابع مشابه
Multi-objective Solution Approaches for Employee Shift Scheduling Problems in Service Sectors (RESEARCH NOTE)
Today, workforce scheduling programs are being implemented in many production and service centers. These sectors can provide better quality products and/or services to their customers, taking into account employees’ desires and preferences in order to increase sector productivity. In this study, an employee shift scheduling problem in the service sector is discussed. In the problem, the aim is ...
متن کاملA New Solution for the Cyclic Multiple-Part Type Three-Machine Robotic Cell Problem based on the Particle Swarm Meta-heuristic
In this paper, we develop a new mathematical model for a cyclic multiple-part type threemachine robotic cell problem. In this robotic cell a robot is used for material handling. The objective is finding a part sequence to minimize the cycle time (i.e.; maximize the throughput) with assumption of known robot movement. The developed model is based on Petri nets and provides a new method to calcul...
متن کاملَA Multi-objective simulated annealing algorithm to solving flexible no-wait flowshop scheduling problems with transportation times
This paper deals with a bi-objective hybrid no-wait flowshop scheduling problem minimizing the makespan and total weighted tardiness, in which we consider transportation times between stages. Obtaining an optimal solution for this type of complex, large-sized problem in reasonable computational time by using traditional approaches and optimization tools is extremely difficult. This paper presen...
متن کاملالگوریتم ممتیک برای حل مسئله زمانبندی کار کارگاهی منعطف با امکان ایجاد وقفه در انجام فعالیتها
Flexible job shop scheduling problem )FJSP( is an extension of the classical job shop scheduling problem which allows an operation to be processed by any machine from a given set. FJSP is NP-hard and mainly presents two difficulties. The first one is to assign each operation to a machine out of a set of capable machines, and the second one deals with sequencing the assigned operations on the ma...
متن کاملA heuristic approach for multi-stage sequence-dependent group scheduling problems
We present several heuristic algorithms based on tabu search for solving the multi-stage sequence-dependent group scheduling (SDGS) problem by considering minimization of makespan as the criterion. As the problem is recognized to be strongly NP-hard, several meta (tabu) search-based solution algorithms are developed to efficiently solve industry-size problem instances. Also, two different initi...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید
ثبت ناماگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید
ورودعنوان ژورنال:
- RAIRO - Operations Research
دوره 42 شماره
صفحات -
تاریخ انتشار 2008