Single-machine scheduling with release dates, due dates and family setup times
نویسندگان
چکیده
We address the NP-hard problem of scheduling n independent jobs with release dates, due dates, and family setup times on a single machine to minimize the maximum lateness. This problem arises from the constant tug-of-war going on in manufacturing between efficient production and delivery performance, between maximizing machine utilization by batching similar jobs and maximizing customers’ satisfaction by completing jobs before their due dates. We develop a branch-and-bound algorithm, and our computational results show that it solves almost all instances with up to about 40 jobs to optimality. The main algorithmic contribution is our lower bounding strategy to deal with family setup times. The key idea is to see a setup time as a setup job with a specific processing time, release date, due date, and precedence relations. We develop several sufficient conditions to derive setup jobs. We specify their parameters and precedence relations such that the optimal solution value of the modified problem obtained by ignoring the setup times, not the setup jobs, is no larger than the optimal solution value of the original problem. One lower bound for the modified problem proceeds by allowing preemption. Due to the agreeable precedence structure, the preemptive problem is solvable in O(n log n) time. 1980 Mathematics Subject Classification (Revision 1991): 90B35.
منابع مشابه
A fuzzy mixed-integer goal programming model for a parallel machine scheduling problem with sequence-dependent setup times and release dates
This paper presents a new mixed-integer goal programming (MIGP) model for a parallel machine scheduling problem with sequence-dependent setup times and release dates. Two objectives are considered in the model to minimize the total weighted flow time and the total weighted tardiness simultaneously. Due to the com-plexity of the above model and uncertainty involved in real-world scheduling probl...
متن کاملSingle machine batch scheduling problem with family setup times and release dates to minimize makespan
In this paper we consider the single machine batch scheduling problem with family setup times and release dates to minimize makespan. We show that this problem is strongly NP-hard, and give an O n n m + 1 m time dynamic programming algorithm and an O(mk k P 2k−1) time dynamic programming algorithm for the problem, where n is the number of jobs, m is the number of families, k is the number of di...
متن کاملMulti-Objective Unrelated Parallel Machines Scheduling with Sequence-Dependent Setup Times and Precedence Constraints
This paper presents a novel, multi-objective model of a parallel machines scheduling problem that minimizes the number of tardy jobs and total completion time of all jobs. In this model, machines are considered as unrelated parallel units with different speeds. In addition, there is some precedence, relating the jobs with non-identical due dates and their ready times. Sequence-dependent setup t...
متن کاملMinimizing Total Weighted Tardiness with Drop Dead Dates in Single Machine Scheduling Problem
This paper deals with minimization of tardiness in single machine scheduling problem when each job has two different due-dates i.e. ordinary due-date and drop dead date. The drop dead date is the date in which jobs’ weights rise sharply or the customer cancels the order. A linear programming formulation is developed for the problem and since the problem is known to be NP-hard, three heuristic...
متن کاملA Possibility Linear Programming Approach to Solve a Fuzzy Single Machine Scheduling Problem
This paper employs an interactive possibility linear programming approach to solve a single machine scheduling problem with imprecise processing times, due dates, as well as earliness and tardiness penalties of jobs. The proposed approach is based on a strategy of minimizing the most possible value of the imprecise total costs, maximizing the possibility of obtaining a lower total costs, and mi...
متن کامل