This paper purports to provide answers to the following questions with regard to multi-crane building construction sites: (1) Do such construction sites differ from smaller sites only in magnitude, or are there unique characteristics that stem from the size of the site and the multitude of cranes? (2) Is equipment planning for such projects similar to that of projects serviced by a small number of cranes? (3) How is equipment planning affected by the site’s surroundings? (4) Does the visibility of multiple cranes in the near and far surroundings of the project affect the approach to equipment planning? Answers to these questions were sought after through the investigation of several measures, based on case studies of mega building projects in Europe, all located in busy urban surroundings. On-site interviews focused on multiple research variables, of which four are used here: project planning stages, planning parties, plan formats, and the cranes on site. The study found that multi-crane sites are characterized by unique features; equipment planning for such sites differs significantly from that conducted for regular sites; the site-surroundings interface plays an important role in equipment and logistics planning for such sites; and the awareness of reputation plays a role in crane selection. The study’s main contribution is in reducing the knowledge gap that exists with regard to the unique determinants of equipment planning for multi-crane projects and to its importance to the success of such projects.

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

TOWER CRANES AND SUPPLY POINTS LOCATING PROBLEM USING CBO, ECBO, AND VPS

Tower cranes are major and expensive equipment that are extensively used at building construction projects and harbors for lifting heavy objects to demand points. The tower crane locating problem to position a tower crane and supply points in a building construction site for supplying all requests in minimum time, has been raised from more than twenty years ago. This problem has already been so...

متن کامل

Building a Multi-Objective Model for Multi-Product Multi-Period Production Planning with Controllable Processing Times: A Real Case Problem

Model building is a fragile and complex process especially in the context of real cases. Each real case problem has its own characteristics with new concepts and conditions. A correct model should have some essential characteristics such as: being compatible with real conditions, being of sufficient accuracy, being logically traceable and etc. This paper discusses how to build an efficient mode...

متن کامل

Analysis of a Tower Crane Accident

Today, steel tower cranes are widely used in the construction sites. In this study, the accident occurred in Turkey in 2006 with the overturning of a tower crane in a construction site and the damage occurred on the nearby buildings due to this accident were taken into consideration. At first, the technical characteristics of the EC-H type tower crane used in that construction and then the reas...

متن کامل

A Framework for Crane Selection in Large-scale Industrial Construction Projects

Selecting the best possible cranes and identifying spatial conflict-free locations on sites can result in productivity and safety improvements for large-scale industrial construction projects. In the current practice, experienced lift engineers select cranes based on the heaviest lift and/or the largest lifting radius of the identified crane. This practice is relatively time-consuming, and opti...

متن کامل

Improving lifting motion planning and re-planning of cranes with consideration for safety and efficiency

Please cite this article in press as: C. Zhang, A. efficiency, Adv. Eng. Informat. (2012), doi:10.10 Safe and efficient operation of cranes requires not only good planning, but also sufficient and appropriate support in real time. Due to the dynamic nature of construction sites, unexpected changes in site layout may create new obstacles for the crane that can result in collisions and accidents....

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:

دوره   شماره 

صفحات  -

تاریخ انتشار 2017