Adapting LPGP to Plan with Deadlines
نویسندگان
چکیده
This paper describes two approaches that enable the AI Planner LPGP to reason about domains with exogenous events and goals with duration: the first investigates how such domains may be encoded using the planning domain definition language PDDL2.1 level 3, while the second involves directly modifying LPGP. Both approaches have been tested in a number of domains and conclusions are drawn about the relative merits of the two approaches.
منابع مشابه
Planning with Timed Literals and Deadlines
This paper describes how PDDL2.1 level 3 may be used to encode timed literals as well as goals with deadlines, which means that planners that have been designed to reason with PDDL2.1 level 3 will not need to be modified in order to solve problems containing timed literals and goals with deadlines. Two encodings are introduced and some preliminary results are presented. In light of these result...
متن کاملMulti-objective optimization of time-cost-quality-carbon dioxide emission-plan robustness in construction projects
Today, the construction industry is facing intense competition and success in this competition depends on several factors. Project managers try to minimize project time and cost, carbon dioxide emission and at the same time maximizing the quality of project and its plan robustness. In this paper, study construction project scheduling considering a discrete trade-off between time, cost, quality,...
متن کاملOn the Use of Temporal Landmarks for Planning with Deadlines
In this paper we present a temporal planning approach for handling problems with deadlines. The model relies on the extraction of temporal landmarks from the problem and the construction of a landmarks graph as a skeleton of the solution plan. A temporal landmark is a proposition that must be achieved in a solution plan to satisfy the problem deadline constraints. Each temporal landmark is asso...
متن کاملDatabases with Deadline and Contingency Constraints
Real time database systems associate the concept of deadlines with transaction executions Previous ap proaches use best e ort techniques to schedule a given set of transactions to meet the deadlines as well as to ensure the consistency of the database However such approaches are inadequate for target applications which have hard real time deadlines that need to be met in the event of crisis sit...
متن کاملInvestigating the distinction of commercial endorsement deadlines with civil commercial documents Iranian law and Geneva and UNCITRAL conventions
One of the common ways of transfer of commercial documents, ownership (bill of exchange, promissory notes and cheque) is endorsement. If the endorsement is subject to Commercial Code, it is considered a commercial endorsement. And if it is out of the scope of this Code, it should be regarded a normal and on the basis of request (claim) transfer. The question that arise here are “how long are th...
متن کامل