Hoist Scheduling Problem in a Real Time Context

نویسندگان

  • J. Lamothe
  • M. Correge
  • J. Delmas
چکیده

An electroplating, or chemical treatment, line is composed of (see fig 1) : tanks containing each a chemical reagent, an input and an output buffer, hoists transporting the products from tank to tank. Therefore, a treatment results from the successive immersion of a product in several tanks. Tanks and hoists can only process one job at a time. Specific chemical constraints exist : • once a product finishes its processing in a tank, it must go as fast as possible to the next tank. This means there is no in-process inventory. • the soaktime, as it corresponds to the time needed to complete a chemical reaction, is not precisely given. But, in order to ensure the quality of the reactions (and, then, of the whole treatment) chemists give minimum and maximum limits. Those quality constraints are considered absolute in printed circuit boards or airplane parts production. As no inventories are allowed, this soaktime tolerance is the only source of flexibility. The control of the hoist's movements with respect to those constraints is known as the Hoist Scheduling Problem (HSP).

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

A Multihoist Model for the Real Time Hoist Scheduling Problem

This paper presents a real time approach for optimizing the production rate of a line in the field of multiproduct Hoist Scheduling Problem (scheduling of the moves of a hoist in electroplating facilities). As a real time context is considered, any time a new job arrives, a new schedule of the whole jobs has to be computed. This local problem is referred as the Dynamic Hoist Scheduling Problem ...

متن کامل

Resolution of graphs with Bounded Cycle Time for the Cyclic Hoist Scheduling Problem

We deal with the Hoist Scheduling Problem, where a hoist carrying products along a production line must be scheduled. Products are taken from a bath once finished an operation and moved to the following one. There are time windows (a minimum and a maximum values) for the time spend at each treatment. The objective is to minimise the total production time. Our contribution is the use of bounds o...

متن کامل

Single hoist cyclic scheduling with multiple tanks: a material handling solution

A hoist controlled by a computer is widely used for moving electroplates which is chemically treated in a sequence of tanks. The hoist scheduling directly a.ects the throughput of a production system. The objective of the hoist scheduling problem is to schedule the moves to maximize the throughput. This paper investigates the hoist scheduling problem, a speci2c material handling issue, in a man...

متن کامل

Optimal Scheduling of CHP-based Microgrid Under Real-Time Demand Response Program

Microgrid (MG) is considered as a feasible solution to integrate the distributed energy sources. In this paper, optimal scheduling of a grid-connected MG is investigated considering different power sources as combined heat and power (CHP) units, only power and heat generating units, and battery storage systems. Two different feasible operating regions are considered for the CHP units. In additi...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:

دوره   شماره 

صفحات  -

تاریخ انتشار 1994