Application of Reliability Analysis in Expansion of Transmission System

نویسندگان

  • Ashok Kumar Mehta
  • Dipak Ray
  • Kesab Bhattacharya
چکیده

In planning studies, the conventional approach for steady state contingency analysis is to test all contingencies sequentially for evaluating system performance and reliability. This analysis consists of simulating outages of one or more generating units and transmission lines to study their effects on bus voltage, generator MVAR outputs and line power flows. But new challenges and uncertainties came in the power sector after the deregulated process. To cope with the increasing uncertainties, new techniques are essential. Expansion of transmission line or equipment considering cost and reliability is a subject of continuing interest. Different mathematical tools have already been developed for this purpose. In this paper transmission line expansion has been selected considering reliability, effective utilization of line and loss. Single outages has been taken considering economic condition of a developing country. A five bus test system has been taken as an example. A generalized computer program has been developed. Index Terms Deregulated electricity market, reliability cost, transmission line expansion.

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Accelerating the Composite Power System Planning by Benders Decomposition

This paper presents an application of Benders decomposition to deal with the complexities in the simultaneous Generation Expansion Planning (GEP) and Transmission Expansion Planning (TEP). Unlike the power system operation fields of study, the power system planning methods are not expected to be fast. However, it is always preferable to speed up computations to provide more analysis options for...

متن کامل

تخصیص ارزش- محور هزینههای خدمات انتقال برق

Despite the fact that transmission network has a vital role in electricity markets and cost of transmission expansion is considerable, but transmission charges represent a small percentage of power system operating costs. Thus, transmission cost allocation should be a reasonable economic indicator to make decisions on facility allocation, transmission expansion and other similar market tasks. ...

متن کامل

برنامه ریزی توسعه شبکه انتقال تحت شرایط بازار برق با در نظر گرفتن هزینه برقراری امنیت

An important factor to be considered in electric power system expansion planning is the security of service that the system is able to provide. In restructured power systems, variables such as agents’ profit or Locational Marginal Price (LMP) variances are considered in transmission expansion planning. To have a secure network this plan would be refined for simulated contingencies. This p...

متن کامل

A Multi-Year Scenario-Based Transmission Expansion Planning Model Incorporating Available Transfer Capability

This paper presents a multi-year scenario-based methodology for transmission expansion planning (TEP) in order to enhance the available transfer capability (ATC). The ATC is an important factor for all players of electricity market who participate in power transaction activities and can support the competition and nondiscriminatory access to transmission lines among all market participants. The...

متن کامل

Transmission Reliability Cost Allocation Based on Contingency Filtering by Economic Indices in Large Power Systems

In this paper, the new approach for the transmission reliability cost allocation (TRCA) problem is proposed. In the conventional TRCA problem, for calculating the contribution of each user (generators & loads or contracts) in the reliability margin of each transmission line, the outage analysis is performed for all system contingencies. It is obvious that this analysis is very time-consuming fo...

متن کامل

A Multi-objective Transmission Expansion Planning Strategy: A Bilevel Programming Method

This paper describes a methodology for transmission expansion planning (TEP) within a deregulated electricity market. Two objective functions including investment cost (IC) and congestion cost (CC) are considered. The proposed model forms a bi-level optimization problem in which upper level problem represents an independent system operator (ISO) making its decisions on investment while in the l...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:

دوره   شماره 

صفحات  -

تاریخ انتشار 2009