Modern semiconductor wafer fabrication facilities need to run at high levels of utilization in order to absorb the huge investments made in facilities and equipment. Simultaneously these facilities desire to minimize the cycle times of products in the factory for a variety of reasons including improved customer response, increased yield, and support of product development efforts. However, probabilistic models argue against the full realization of both of these goals at the same time. Digital Equipment's Fab 6 facility had implemented a series of factory rules aimed at achieving these dual purposes. However this facility faced some unique challenges based on dual the mission of the fab to make multiple products and to cooperate with product development direction. Available publications and theory were considered inadequate to evaluate the effectiveness of the policies in use. This study was conducted to assess the contribution to cycle time and cycle time variability of three operational policies in use in Fab 6. The three policies include start policy, dispatch policy and kanban-type control system. Through a design of experiments style investigation conducted on a simulation model of the factory, it will be shown that the fab has opportunities to improve its cycle time performance by adopting different policies. Moreover, it will be demonstrated that certain combinations of policies do not work well together and should be avoided. Thesis Supervisors: Assistant Professor David Cochran, Mechanical Engineering Professor Larry Wein, Management Acknowledgments I gratefully acknowledge the support and resources made available through the Leaders for Manufacturing Program, a partnership between the Massachusetts Institute of Technology and major United States manufacturing companies. This research project would not have been successful without the resources and support of the Fab 6 organization of Digital Equipment Corporation. In particular, I would like to thank Ellen Mager and Karl Koch for their direction and input. Professors Dave Cochran and Larry Wein provided important research insights during the internship period and valuable writing direction during the thesis phase. This paper would not exist without their assistance. My MIT experience could not have happened without the prayerful and loving support of my parents Duane and Marilyn Gifford and my new parents Hae-Yong and Song-Cha Park. Nor would I have survived the hot summers and cold winters without the unwavering commitment of my dear wife, Kyoung. Table of

برای دانلود رایگان متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

A Scheduling Model for the Re-entrant Manufacturing System and Its Optimization by NSGA-II

In this study, a two-objective mixed-integer linear programming model (MILP) for multi-product re-entrant flow shop scheduling problem has been designed. As a result, two objectives are considered. One of them is maximization of the production rate and the other is the minimization of processing time. The system has m stations and can process several products in a moment. The re-entrant flow sho...

متن کامل

Solving Re-entrant No-wait Flexible Flowshop Scheduling Problem; Using the Bottleneck-based Heuristic and Genetic Algorithm

In this paper, we study the re-entrant no-wait flexible flowshop scheduling problem with makespan minimization objective and then consider two parallel machines for each stage. The main characteristic of a re-entrant environment is that at least one job is likely to visit certain stages more than once during the process. The no-wait property describes a situation in which every job has its own ...

متن کامل

Optimal control of a linearized continuum model for re-entrant manufacturing production systems

A re-entrant manufacturing system producing a large number of items and involving many steps can be approximately modeled by a hyperbolic partial differential equation (PDE) according to mass conservation law with respect to a continuous density of items on a production process. The mathematic model is a typical nonlinear and nonlocal PDE and the cycle time depends nonlinearly on the work in pr...

متن کامل

Modeling of a Probabilistic Re-Entrant Line Bounded by Limited Operation Utilization Time

This paper presents an analytical model based on mean value analysis (MVA) technique for a probabilistic re-entrant line. The objective is to develop a solution method to determine the total cycle time of a Reflow Screening (RS) operation in a semiconductor assembly plant. The uniqueness of this operation is that it has to be borrowed from another department in order to perform the production s...

متن کامل

Analysis of a Conservation Law Modeling a Highly Re-entrant Manufacturing System

This article studies a hyperbolic conservation law that models a highly re-entrant manufacturing system as encountered in semi-conductor production. Characteristic features are the nonlocal character of the velocity and that the influx and outflux constitute the control and output signal, respectively. We prove the existence and uniqueness of solutions for L-data, and study their regularity pro...

متن کامل

Re-entrant Manufacturing Systems

Re-entrant manufacturing systems differ from traditional manufacturing systems in the sense that a job may visit a service station more than once, at various stages of the product development cycle. Several parts at different stages of processing may be in contention for service at the same machine, which gives rise to the need to solve scheduling problems. This document surveys some of the fac...