Equipment repaired is equipment gained

نویسنده

  • V Srinivasan
چکیده

According to WHO, at any one time, around 50 per cent of medical equipment in lowand middle-income countries cannot be used because of lack of maintenance or spare parts.1 We have found that unwillingness or inability to repair equipment and put it back in use is also a major cause. New equipment is made available by different international non-government organisations (INGOs) competing with one another to help users. However, these organisations often do not support users with repairs, nor do they train users in maintenance and repair. What happens to pieces of equipment that do not work? Usually they remain in the hospital, occupying space needed for patient care; they are sometimes abandoned in open spaces and exposed to the elements. In 2007, the author was part of a team that ran a two-week biomedical workshop organised by an INGO in a low-income country. On the first day, the author noticed an operating table lying near the hospital garbage pit (Figure 1). He thought something should be done about it before the end of the workshop. On a closer examination the table was found to be of Japanese make, donated to the hospital under a bilateral cooperation programme. It was covered in dust and weeds had grown over it. The base and body were made of thick stainless steel so that the equipment had not rusted, though it had been there for more than a year. On the eighth working day a suggestion was made to the trainees that they should try putting the table back to use. Eight volunteered but one thought it a waste of time to work on the table, which had clearly been abandoned for a long time. The table was pulled out of the mud and weeds and shifted to a hard surface. That was a difficult job but heavy rain on the previous night had softened the ground which made the task easier. We then tried to find out why the table had been abandoned. After a thorough wash with water to remove all the dust and dirt that had accumulated on it, the table was examined. The table could not be raised or lowered as designed, and the obvious conclusion was that the hydraulic system was not functioning. We opened the cylinder that should have oil it, but found it to be empty. It is likely that the oil had drained drop by drop and no one had taken serious note of it. Eventually, when the oil level was low, the table had no longer moved up and down. The ‘broken’ table had then been removed from the operating theatre and left in the open, where the remaining oil had drained completely. Next, the author and trainees dismantled the operating table part by part and shifted it to the workshop. In the workshop, the parts of the table were cleaned further and all moving parts were oiled. The gasket (the rubber ring which seals the system) had dried out because the table had been left outside for many months; we oiled it to ensure that the hydraulic system would once again have an airtight seal. We filled the hydraulic system with lubricating oil (poured into the cylinder using a funnel). When assembled, all other functions of the table were found to work as designed (Figure 2). A thoughtful person in the hospital had saved the upholstery, and very soon the table was shifted to the operating theatre for use. Due to the hard work of my colleague Poornachandran and the eight trainees, the hospital now has an extra operating table. Equipment repaired is equipment gained! Some of the lessons learned by the trainees were:

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Improving the performance measurement using overall equipment effectiveness in an automotive industry

Considering the present business competitive scenario, the automotive industry is under pressure to achieve higher productivity. A high level of performance and quality standard could be achieved through improving the Overall Equipment Effectiveness (OEE) of the equipment in an automotive industry. Thus, the aim of this study is to investigate the performance measurement through OEE theory in a...

متن کامل

Thermoeconomic optimization and exergy analysis of transcritical CO2 refrigeration cycle with an ejector

The purpose of this research is to investigate thermoeconomic optimization and exergy analysis of transcritical CO2 refrigeration cycle with an ejector. After modeling thermodynamic equations of elements and considering optimization parameters of emerging temperature of gas of cooler (Tgc) , emerging pressure of cooler's gas (Pgc) , and eva...

متن کامل

Power Grid Equipment Supplier Selection Based on Cloud Model and Hesitant Linguistic Information

Power grid equipment is the guarantee of the safe and stable operation of power grids, selecting rational power grid equipment suppliers is the focus of power grid enterprise. In order to select the equipment supplier for grid enterprises more objectively and comprehensively, this paper proposes a power grid equipment supplier selection method based on cloud model and hesitant linguistic inform...

متن کامل

Thermoeconomic optimization and exergy analysis of transcritical CO2 refrigeration cycle with an ejector

The purpose of this research is to investigate thermoeconomic optimization and exergy analysis of transcritical CO2 refrigeration cycle with an ejector. After modeling thermodynamic equations of elements and considering optimization parameters of emerging temperature of gas of cooler (Tgc) , emerging pressure of cooler's gas (Pgc) , and eva...

متن کامل

Stress echocardiography: personnel and technical equipment.

In recent years, stress echocardiography has gained broad acceptance as a non-invasive method for the diagnosis of coronary artery disease. Facing different protocols, dosages and instrumentation, official guidelines for the performance, standardization and quality control of stress echocardiograms are needed; however, so far they are not available. This paper recommends the type of personnel a...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:

دوره 22  شماره 

صفحات  -

تاریخ انتشار 2009