Probabilistic design of settling basins for environmental compliance

نویسنده

  • William de Lange
چکیده

I would like to thank my graduation committee for their supervision, advice and support. I would also like to thank prof.dr.ir. L.C. van Rijn and dr.ir. J.C. Winterwerp for their valuable advices and dr.ir. M. van Koningsveld for providing the frame work of the model and for his comments and suggestions. Further I would like to thank my colleagues from the environmental department of Van Oord for answering my questions and the nice working environment. In particular, I thank my parents, family and friends for their interest and support. Summary There is an increasing public awareness for the potential negative environmental effects of dredging and reclamation projects. Therefore, almost every project requires an environmental impact assessment (EIA). These EIA's usually provide strict environmental requirements that must be taken into consideration in the design and execution of a project. These environmental requirements can form a high risk for contractors because the inability to meet the environmental requirements can result in large fines or downtime. The determination of the environmental impacts of these projects includes large uncertainties. This results in stringent environmental requirements and a conservative approach by the contractor. Understanding these uncertainties leads to a more realistic view of the situation and provides a better basis for establishing the environmental requirements. The environmental impacts caused by the release of suspended sediments are often an important issue in an EIA. The insight into the released amount of suspended sediment particles is an important link in the investigation into the environmental impacts caused by this release. These impacts can be an increased turbidity due to the suspended sediment. Especially corals are very vulnerable for increased levels of turbidity and it also causes a reduction of photosynthesis by marine life. This study is restricted to provide insight into the emission of suspended sediment particles due to the release of return water. This water is used to pump dredged material to the disposal area after which the excess water is released. Settling basins can be used to remove fines particles from the return water. The settling of the suspended sediment particles in a settling basin takes time. The remaining concentration of suspended particles in the outflowing water and the discharge give the emission of suspended sediment particles. This outflow concentration is hard to predict due to varying circumstances (e.g. wind, discharge and inflow concentration) and uncertainties in the settling process (e.g. agglomeration of clay particles). …

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Evaluation of sediments trap efficiency in medium-scale settling basins (Case Study: Settling basin of Kamandan intake)

One of the most important issues in water supply for agriculture or drinking is sediment control.Sedimentation in water conveyance channels reduces transmission efficiency. this study evaluated theefficiency of settling basin of Kamandan intake that is located in the village of Aligoodarz in Lorestanprovince. At first sample from water and sediment in inlet and outlet of settling basin in diffe...

متن کامل

کاربرد صفحات هدایت جریان در حوضچه رسوب‌گیر برای افزایش راندمان تله‌اندازی

Settling basins are one of the most essential structures for the separation of inflow sediments. This structure is established to enhance the water quality after the river-basins and water channels. Numerous studies have been conducted on the design of this structure and different methods have been provided to increase its efficiency. However, the use of simple settling basins with the minimum ...

متن کامل

A mathematical model for sustainable probabilistic network design problem with construction scheduling considering social and environmental issues

Recent facility location allocation problems are engaged with social, environmental and many other aspects, besides cost objectives.Obtaining a sustainable solution for such problems requires development of new mathematical modeling and optimization algorithms. In this paper, an uncapacitated dynamic facility location-network design problem with random budget constraints is considered. Social i...

متن کامل

Integrating probabalistic and targeted compliance monitoring for comprehensive watershed assessment.

Environmental monitoring typically falls into one of two broad categories. Targeted designs, utilizing fixed stations, focus on describing and quantifying impacts, tracking trends, and assessing compliance with regulatory guidelines or limits. Probabilistic designs, in contrast, draw sampling stations at random from an area or region, and the stations are used to describe conditions in the regi...

متن کامل

Using Total Solids Concentration to Estimate Nutrient Content of Feedlot Runoff Effluent from Solid Settling Basins, Vegetative Infiltration Basins, and Vegetative Treatment Areas

Increased environmental awareness has promoted the need for improved feedlot runoff control. The use of vegetative treatment systems (VTSs) to control and treat feedlot runoff may enhance environmental security and protect water quality. Knowledge of effluent nutrient concentrations throughout the vegetative treatment system is required to evaluate impact on water quality and system performance...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:

دوره   شماره 

صفحات  -

تاریخ انتشار 2011