Sub-Optimal Scheduling of a Multi-Product Batch Manufacturing System using an Integer Programming Solution

نویسندگان

  • W. Weyerman
  • D. West
  • S. Warnick
  • Sean Warnick
چکیده

Abstract— In order to determine factory capacity or necessary time to reach a desired quota, the manager of a multi-product batch manufacturing system must know the best method of scheduling for the factory. To determine the optimal scheduling, we first create a model of the factory. This model is used to simulate the factory. Using this simulation and an integer programming formulation, we determine the scheduling algorithm that will minimize the amount of idle time of the factory.

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Sub-Optimal Scheduling of a Flexible Batch Manufacturing System using an Integer Programming Solution

Abstract— In order to determine necessary time to reach a desired quota, the manager of a flexible batch manufacturing system must know the best method of scheduling the factory. To determine a sub-optimal schedule, we first create a model of the factory. This model is used to simulate the factory. Using this simulation and an integer programming formulation, we determine a scheduling algorithm...

متن کامل

A Mathematical Programming Model and Genetic Algorithm for a Multi-Product Single Machine Scheduling Problem with Rework Processes

In this paper, a multi-product single machine scheduling problem with the possibility of producing defected jobs, is considered. We concern rework in the scheduling environment and propose a mixed-integer programming (MIP) model for the problem.  Based on the philosophy of just-in-time production, minimization of the sum of earliness and tardiness costs is taken into account as the objective fu...

متن کامل

The Finite Horizon Economic Lot Scheduling in Flexible Flow Lines

This paper addresses the common cycle multi-product lot-scheduling problem in flexible flow lines (FFL) where the product demands are deterministic and constant over a finite planning horizon. Objective is minimizing the sum of setup costs, work-in-process and final products inventory holding costs per time unite while satisfying the demands without backlogging. This problem consists of a combi...

متن کامل

A multi-product vehicle routing scheduling model with time window constraints for cross docking system under uncertainty: A fuzzy possibilistic-stochastic programming

Mathematical modeling of supply chain operations has proven to be one of the most complex tasks in the field of operations management and operations research. Despite the abundance of several modeling proposals in the literature; for vast majority of them, no effective universal application is conceived. This issue renders the proposed mathematical models inapplicable due largely to the fact th...

متن کامل

Trucks Scheduling in a Multi-product Cross Docking System with Multiple Temporary Storages and Multiple Dock Doors

In order to reduce costs and increase efficiency of a supply chain system, cross docking is one of the most important strategies of warehousing for consolidation shipments from different suppliers to different customers. Products are collected from suppliers by inbound trucks and then moved to customers by outbound trucks through cross dock. Scheduling of trucks plays important role in the cros...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:

دوره   شماره 

صفحات  -

تاریخ انتشار 2005