Preparing Accelerator Systems for the RHIC Sextant Commissioning

نویسندگان

  • W. Fischer
  • M. Harrison
  • W. MacKay
  • R. Olsen
  • S. Peggs
چکیده

The Relativistic Heavy Ion Collider (RHIC) construction is progressing steadily towards completion in 1999 when beams will circulate in both collider rings. One of the major tests of the RHIC project was the commissioning of the first sextant with gold ion beams in early 1997. This is a report on preparation of the RHIC accelerator systems for the first sextant test. It includes beam position monitors, timing, injection correction through the magnetic septum and kickers, current transformers, “flags” and the ionization beam profile monitors, beam loss monitors, beam and quench permit link system, power supply controls, and the configuration database system. The software and hardware development and coordination of the different systems before commissioning were regularly checked during bi-weekly, and (later) weekly, progress report meetings.

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

The Relativistic Heavy Ion Collider Control System

The Relativistic Heavy Ion Collider control system has been used in the commissioning of the AGS to RHIC transfer line and in the first RHIC sextant test. Much of the controls infrastructure for networks and links has been installed throughout the collider. Almost all of the controls hardware modules needed for early RHIC operations have been designed and tested. Many of these VME modules are a...

متن کامل

RHIC Instrumentation

The Relativistic Heavy Ion Collider (RHIC) consists of two 3.8 km circumference rings utilizing 396 superconducting dipoles and 492 superconducting quadrupoles. Each ring will accelerate approximately 60 bunches of 10 protons to 250 GeV, or 10 fully stripped gold ions to 100 GeV/nucleon. Commissioning is scheduled for early 1999 with detectors for some of the 6 intersection regions scheduled fo...

متن کامل

Commissioning and early experience with a new generation low-energy linear accelerator in zahedan

Introduction: Since commissioning beam data are treated as a reference and ultimately used by treatment planning systems, it is vitally important that the collected data are of the highest quality to avoid dosimetric and patient treatment errors that may subsequently lead to a poor radiation outcome. Beam data commissioning should be performed with appropriate knowledge and pr...

متن کامل

Power Systems for the Rhic First Sextant Test

The first sextant test of the RHIC project is an opportunity to evaluate the many systems that must work together for the accelerator to operate. For the main dipole string, the actual main quadrupole power supply with its DSP regulator and output circuit compartment will be used. Temporary supplies will be used for the main quadrupole string, quadrupole offset, and quadrupole shunt supplies. T...

متن کامل

Commissioning the First Mobile Dedicated Accelerator for Intraoperative Electron Radiotherapy in Iran

Introduction: Intraoperative radiotherapy is a radiotherapy technique in which a high single fraction of radiation dose is delivered to the patient after surgery and Concurrent with anesthesia time. The most frequent method for IORT implementation is Intraoperative electron radiotherapy (IOERT), in which, some dedicated and high dose per pulse electron accelerators are employe...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:

دوره   شماره 

صفحات  -

تاریخ انتشار 2008