A two-stage coupled algorithm for an integrated maintenance planning and flowshop scheduling problem with deteriorating machines
نویسندگان
چکیده
We address a novel integrated maintenance and production scheduling problem in a multi-machine and multi-period production system, considering maintenance as a long-term decision. Deterioration of machines over time decreases production capacity. Since maintenance activities improve machine conditions, increasing production capacity, but also take time that cannot be used for production, the challenge is to assign maintenance to periods and to schedule maintenance and production activities within each period to minimize the combined cost of maintenance and lost production over the planning horizon. Motivated by logic-based Benders decomposition, we design an integrated two-stage algorithm to solve the problem. The first stage assigns maintenance to machines and time periods, abstracting the scheduling problem, while the second stage creates a schedule for the current time period. The first stage is then re-solved using feedback from the schedule. This iteration between maintenance planning and scheduling continues until the solution costs in two stages converge. The integrated approach models the interdependencies between maintenance and scheduling decisions in highly coupled processes such as wafer fabrication in the semiconductor manufacturing. Our results demonstrate that the benefit of integrated decision making increases when maintenance is less expensive relative to lost production cost and that Maliheh Aramon Bajestani Department of Mechanical & Industrial Engineering University of Toronto, Canada E-mail: [email protected] J. Christopher Beck Department of Mechanical & Industrial Engineering University of Toronto, Canada E-mail: [email protected] a longer horizon for maintenance planning is beneficial when maintenance cost increases.
منابع مشابه
A Reliability based Modelling and Optimization of an Integrated Production and Preventive Maintenance Activities in Flowshop Scheduling Problem
Traditional scheduling problems with the batch processing machines (BPM) assume that machines are continuously available, and no time is needed for their preventive maintenance (PM). In this paper, we study a realistic variant of flowshop scheduling which integrates flow shop batch processing machines (FBPM) and preventive maintenance for minimizing the makespan. In order to tackle the given pr...
متن کاملSolving Re-entrant No-wait Flexible Flowshop Scheduling Problem; Using the Bottleneck-based Heuristic and Genetic Algorithm
In this paper, we study the re-entrant no-wait flexible flowshop scheduling problem with makespan minimization objective and then consider two parallel machines for each stage. The main characteristic of a re-entrant environment is that at least one job is likely to visit certain stages more than once during the process. The no-wait property describes a situation in which every job has its own ...
متن کاملA Two-Stage Hybrid Flowshop Scheduling Problem with Serial Batching
In this paper the problem of serial batch scheduling in a two-stage hybrid flow shop environment with minimizing Makesapn is studied. In serial batching it is assumed that jobs in a batch are processed serially, and their completion time is defined to be equal to the finishing time of the last job in the batch. The analysis and implementation of the prohibited transference of jobs among the mac...
متن کاملMinimizing Total Weighted Tardiness in a Flexible Flowshop Environment Considering Batch Processing Machines
Scheduling in production environments is used as a competitive tool to improve efficiency and respond to customer requests. In this paper, a scheduling problem is investigated in a three-stage flexible flowshop environment with the consideration of blocking and batch processing. This problem has been inspired by the charging and packaging line of a large battery manufacturer. In this environmen...
متن کاملAppling Metaheuristic Algorithms on a Two Stage Hybrid Flowshop Scheduling Problem with Serial Batching (RESEARCH NOTE)
In this paper the problem of serial batch scheduling in a two-stage hybrid flow shop environment with minimizing Makesapn is investigated. In serial batching it is assumed that jobs in a batch are processed serially, and their completion time is defined to be equal to the finishing time of the last job in the batch. The analysis and implementation of the prohibited transference of jobs among th...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید
ثبت ناماگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید
ورودعنوان ژورنال:
- J. Scheduling
دوره 18 شماره
صفحات -
تاریخ انتشار 2015