6.946 Final Project

نویسندگان

  • Dennis V. Perepelitsa
  • Gerald Jay Sussman
  • Jack Wisdom
چکیده

Dennis V. Perepelitsa 19 December 2006 Gerald Jay Sussman, Jack Wisdom Exercise 5.32: Hierarchical Jacobi coordinates (a) Canonical heliocentric coordinates The canonical heliocentric transformation singles out the center of mass of the system. The other coordinates are computed with respect to this coordinate. Specifically, the relationships between the elements of (x′0, . . . , x ′ n−1) and (x0, . . . , xn−1) are x′0 = X = ∑i=n−1 i=0 mixi ∑i=n−1 i=0 mi x′i = xi − x0, for i > 0 (1) We want to construct an F2-type generating function that relates the relationship between the transformed and original coordinates. Using x = ∂2F2(t;x; p ), we have

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

6.946 Driven Pendulum Project

We investigate several regions of parameter space of a driven pendulum system over which specific phenomena occur. The pivot on which the pendulum hangs is driven in the vertical direction by a periodic force A cos(ωt). We reuse code relevant to the driven pendulum system in SICM: Section 1.6.2 contains the Lagrangian for a driven pendulum in general, Section 1.7 provides for the specific case ...

متن کامل

Forecasting Final Schedule and Cost of Projects by Using Statistical and Mathematical Method

Earned value management (EVM) has prepared some methods to forecast final costs of projects. These methods were not developed since the start of formation and were gradually completed, of course with one exception that is its authenticity, they are still remained unchanged. At the present time EVM guide does not apply from schedule indices to forecast schedule for completion of project and ...

متن کامل

تعیین ضریب عملکرد پروژه در مدیریت ارزش کسب شده با استفاده از مدیریت ریسک به منظور تخمین نتایج پایانی کار پیمانکاران

One of the common questions in all projects, is "How much would be the final cost of the project?" or "How much would be the completion duration of the project?". Earned Value Management presents a method for estimation of these results. In general methods and formula of Earned Value Management, future trend of project, are anticipated completely based on its previous trend, and changes in envi...

متن کامل

Developing a Theoretical and Operational Knowledge Audit Model for Project- Based Organizations

Background/aim. Considering the underlying role played by knowledge management in project-based organizations; and, the fact that knowledge audit is the most important step in supplying, maintaining and updating the content of knowledge management systems; this research effort is aimed at designing an appropriate knowledge audit model based on the requirements and factors of knowledge audit in ...

متن کامل

Experimental Studies on Concrete with Bentonite as Mineral Admixture

The present investigation deals with effect of bentonite clay on concrete. The concrete was produced by partial replacement of OPC with mineral admixture bentonite clay in percentages of 0%, 5%, 10%, 15% and 20%. The M20 grade of concrete was designed. The compressive strength, split tensile strength and flexural strength were found for the specimens. The present investigation is to study the e...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:

دوره   شماره 

صفحات  -

تاریخ انتشار 2007