Last time buy and repair decisions for spare parts
نویسندگان
چکیده
Original Equipment Manufacturers (OEM’s) of advanced capital goods often offer service contracts for system support to their customers, for which spare parts are needed. Due to technological changes, suppliers of spare parts may stop production at some point in time. As a reaction to that decision, an OEM may place a so-called Last Time Buy (LTB) order to cover demand for spare parts during the remaining service period, which may last for many years. The fact that there might be other alternative sources of supply in the next periods complicates the decision on the LTB. In this paper, we develop a heuristic method to find the nearoptimal LTB quantity in presence of an imperfect repair option of the failed parts that can be returned from the field. Comparison of our method to simulation shows high approximation accuracy. Numerical experiments reveal that repair is an excellent option as alternative sourcing, even if it is more expensive than buying a new part, because of postponement of the repair decisions. In addition, we show the impact of other key parameters on costs and LTB quantity.
منابع مشابه
Closed-loop Supply Chain Inventory-location Problem with Spare Parts in a Multi-Modal Repair Condition
In this paper, a closed-loop location-inventory problem for spare parts is presented. The proposed supply chain network includes two echelons, namely (1) distribution centers (DCs) and repairing centers (RCs) and (2) operational bases. Multiple spare parts are distributed among operational bases from distribution centers in the forward supply chain and failed spare parts from operational bases ...
متن کاملImproving spare parts inventory control at a repair shop ¬リニ
We study spare parts inventory control for an aircraft component repair shop. Inspection of a defective component reveals which spare parts are needed to repair it, and in what quantity. Spare part shortages delay repairs, while aircraft operators demand short component repair times. Current spare parts inventory optimization methods cannot guarantee the performance on the component level, whic...
متن کاملAn optimal approach for the joint problem of level of repair analysis and spare parts stocking
We propose a method that can be used when deciding on how to maintain capital goods, given a product design and the layout of a repair network. Capital goods are physical systems that are used to produce products or services. They are expensive and technically complex and have high downtime costs. Examples are manufacturing equipment, defense systems, and medical devices. Due to the high downti...
متن کاملLast time buy decisions for products sold under warranty
Manufacturers supplying products under warranty need a strategy to deal with failures during the warranty period: repair the product or replace it by a new one, depending on e.g. age and/or usage of the failed product. An (implicit) assumption in virtually all models is that new products to replace the failed ones are immediately available at given replacement costs. Because of the short life c...
متن کاملAn iterative method for the simultaneous optimization of repair decisions and spare parts stocks
In the development process of a capital good, it should be decided how to maintain it once it is in the field. The level of repair analysis (LORA) is used to answer the questions: 1) which components to repair upon failure, and which to discard, 2) at which locations in the repair network to perform the repairs, and 3) at which locations to deploy resources, such as repair equipment. Next, it s...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید
ثبت ناماگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید
ورودعنوان ژورنال:
- European Journal of Operational Research
دوره 244 شماره
صفحات -
تاریخ انتشار 2015