Advanced enterprise resource management systems for the batch industry. The TicTacToe algorithm

نویسندگان

  • M. Badell
  • L. Puigjaner
چکیده

Since 1997 the authors have prototyped an enterprise resource management (ERM) system recommending essential improvements to the available software packages, which today claim automatic real time performance and an efficient transaction-oriented approach. The ERM system proposed is a decision-making tool for the manufacturing industry, which makes integrated financial/production trade-off planning and optimisation in the supply chain management. The application supports management cycles because during its use are available degrees of freedom to make the system work as a decision-making tool. The enterprises must be aware of its internal problems to be dynamically approachable instead of prematurely evolving to networked enterprises by links in the electronic commerce. ERM systems are capable of managing dynamically realistic and optimal delivery dates with price-time trade-off during the marketing activities. Cost objective functions integrated with system performance measures are developed, including a cost model to evaluate the due date policy economics in real time. The order management system proposed is based on the TicTacToe algorithm, which follows an exact non-combinatorial deterministic approach to time and optimise production sequences in multiproduct plants in very short time using asymmetric travelling salesman problem formulations for the scheduling task. The resulting tool is appropriate to fulfil the requirements of autonomous order entry systems in integrated real time systems. © 2001 Elsevier Science Ltd. All rights reserved.

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

A Proposed Model for Assessing the Determinants of Enterprise Resource Planning Adoption and Satisfaction

 The complex information systems such as enterprise resource planning (ERP) systems are essential for organizations to make them competitive. However, the success of ERP system projects is a difficult process as it involves different types of end user assessment. The main objective of the present study is to find the key determinants that open the door to employee satisfaction and adoption of E...

متن کامل

Explaining the Competitive Advantage of Enterprise Resource Planning Adoption: Insights Egyptian Higher Education Institutions

Organizations nowadays focus on, not implementing ERP systems, but also leveraging ERP systems as part of their digital strategy. They holistically address people, processes, and technology for a digital transformation. Meanwhile, higher education institutions (HEIs) are also facing an imperative need for the implementation of modern technologies to stay competitive and differentiate them as an...

متن کامل

Towards Measuring the Project Management Process During Large Scale Software System Implementation Phase

Project management is an important factor to accomplish the decision to implement large-scale software systems (LSS) in a successful manner. The effective project management comes into play to plan, coordinate and control such a complex project. Project management factor has been argued as one of the important Critical Success Factor (CSF), which need to be measured and monitored carefully duri...

متن کامل

Enterprise Resource Planning and Business Intelligence: The Importance of Integration

The advancement of information and communications technologies (ICT) has significantly intensified market competition the world over. One of the most widespread solutions is the use of enterprise resource planning systems that has proved to support the integration and automation of the processes, the improvement of the performance, and the reduction of costs. ERP involves the planning and manag...

متن کامل

An improved memetic algorithm to minimize earliness–tardiness on a single batch processing machine

In this research, a single batch processing machine scheduling problem with minimization of total earliness and tardiness as the objective function is investigated.We first formulate the problem as a mixed integer linear programming model. Since the research problem is shown to be NP-hard, an improved memetic algorithmis proposed to efficiently solve the problem. To further enhance the memetic ...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:

دوره   شماره 

صفحات  -

تاریخ انتشار 2015