Improved Progressive BKZ Algorithms and Their Precise Cost Estimation by Sharp Simulator
نویسندگان
چکیده
In this paper, we investigate a variant of the BKZ algorithm, called progressive BKZ, which performs BKZ reductions by starting with a small blocksize and gradually switching to larger blocks as the process continues. We discuss techniques to accelerate the speed of the progressive BKZ algorithm by optimizing the following parameters: blocksize, searching radius and probability for pruning of the local enumeration algorithm, and the constant in the geometric series assumption (GSA). We then propose a simulator for predicting the length of the Gram-Schmidt basis obtained from the BKZ reduction. We also present a model for estimating the computational cost of the proposed progressive BKZ by considering the efficient implementation of the local enumeration algorithm and the LLL algorithm. Finally, we compare the cost of the proposed progressive BKZ with that of other algorithms using instances from the Darmstadt SVP Challenge. The proposed algorithm is approximately 50 times faster than BKZ 2.0 (proposed by Chen-Nguyen) for solving the SVP Challenge up to 160 dimensions.
منابع مشابه
A Measure Version of Gaussian Heuristic
Most applicable lattice reduction algorithms used in practice are BKZ (Block-Korkine-Zolotarev) type algorithms as the blockwise generalizations of the LLL algorithm (Lenstra-Lenstra-Lovasz). Its original version was proposed by Schnorr and Euchner in 1991. The quality of reduced lattice bases is measured by the Hermitian factor ||b1|| vol(L)1/d and the d-th root of this factor which is called ...
متن کاملSoftware Cost Estimation by a New Hybrid Model of Particle Swarm Optimization and K-Nearest Neighbor Algorithms
A successful software should be finalized with determined and predetermined cost and time. Software is a production which its approximate cost is expert workforce and professionals. The most important and approximate software cost estimation (SCE) is related to the trained workforce. Creative nature of software projects and its abstract nature make extremely cost and time of projects difficult ...
متن کاملA Novel ICA-based Estimator for Software Cost Estimation
One of the most important and valuable goal of software development life cycle is software cost estimation or SCE. During the recent years, SCE has attracted the attention of researchers due to huge amount of software project requests. There have been proposed so many models using heuristic and meta-heuristic algorithms to do machine learning process for SCE. COCOMO81 is one of the most popular...
متن کاملA New Optimized Hybrid Model Based On COCOMO to Increase the Accuracy of Software Cost Estimation
The literature review shows software development projects often neither meet time deadlines, nor run within the allocated budgets. One common reason can be the inaccurate cost estimation process, although several approaches have been proposed in this field. Recent research studies suggest that in order to increase the accuracy of this process, estimation models have to be revised. The Construct...
متن کاملThe BKZ Simulation Algorithm
The best reduction algorithm for lattices with high dimensions known today is the BKZ reduction algorithm by Schnorr and Euchner. The running time of the BKZ reduction algorithm, however, increases significantly with higher blocksizes. The BKZ simulation algorithm by Chen and Nguyen predicts the Gram-Schmidt norms of a lattice basis after a given time of rounds of BKZ reduction. Given the cost ...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید
ثبت ناماگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید
ورودعنوان ژورنال:
- IACR Cryptology ePrint Archive
دوره 2016 شماره
صفحات -
تاریخ انتشار 2016