Integrating Off-line and On-line Scheduling Approaches
نویسندگان
چکیده
Solving a scheduling problem consists in finding an initial solution able to model all the complex constraints that relate the problem activities. Moreover, the solving process should be necessarily considered as propaedeutic for the next phase of any schedule’s life: its execution in the real world. The inherent unpredictability of real working environments poses serious difficulties to which the scheduling community normally responds by (1) introducing methodologies that tend to increase schedule robustness (off-line phase, proactive approach), and by (2) developing fast-reaction techniques to be employed during schedule execution (on-line phase, reactive approach). In the previous edition of this workshop we presented a benchmark generator for the reactive scheduling problem. This problem consists in monitoring the execution of a schedule and repairing it every time it is deemed necessary. The main motivation behind our previous work came out from the recognized lack (hence the necessity) of benchmark sets for this specific problem. In this paper we provide an empirical study based on the same benchmark generator which focuses on the mutual interactions among a set of off-line and on-line constraint-based scheduling approaches. We devise a set of closed loop execution management algorithms, and compare their behavior within an experimental framework which allows to directly assess the consequences of each chosen strategy combination, through simulated schedule executions. A number of interesting results are described that open new perspectives for future work based on this integrated schema.
منابع مشابه
Meta heuristic for Minimizing Makespan in a Flow-line Manufacturing Cell with Sequence Dependent Family Setup Times
This paper presents a new mathematical model for the problem of scheduling part families and jobs within each part family in a flow line manufacturing cell where the setup times for each family are sequence dependent and it is desired to minimize the maximum completion time of the last job on the last machine (makespan) while processing parts (jobs) in each family together. Gaining an optimal s...
متن کاملIntegration of Constraint-Based Off-line and On-line Approaches to Project Scheduling
Solving a scheduling problem involves considerations of twofold nature: on one hand, the solution must be searched according to specific optimization needs (off-line requirements), while on the other hand, great effort should be employed into producing solutions which can be safely put into execution in unpredictable environments (on-line requirements). In many cases, these two classes of neces...
متن کاملSimultaneous Lot Sizing and Scheduling in a Flexible Flow Line
This paper breaks new ground by modelling lot sizing and scheduling in a flexible flow line (FFL) simultaneously instead of separately. This problem, called the ‘General Lot sizing and Scheduling Problem in a Flexible Flow Line’ (GLSP-FFL), optimizes the lot sizing and scheduling of multiple products at multiple stages, each stage having multiple machines in parallel. The objective is to satisf...
متن کاملTransformation Methods for Off-line Schedules to Attributes for Fixed Priority Scheduling
Off-line scheduling and fixed priority scheduling (FPS) are often considered as complementing and incompatible paradigms. A number of industrial applications demand temporal properties (predictability, jitter constraints, endto-end deadlines, etc.) that are typically achieved by using off-line scheduling. The rigid off-line scheduling schemes used, however, do not provide for flexibility. FPS h...
متن کاملScheduling of Multiple Autonomous Guided Vehicles for an Assembly Line Using Minimum Cost Network Flow
This paper proposed a parallel automated assembly line system to produce multiple products having multiple autonomous guided vehicles (AGVs). Several assembly lines are configured to produce multiple products in which the technologies of machines are shared among the assembly lines when required. The transportation between the stations in an assembly line (intra assembly line) and among station...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
عنوان ژورنال:
دوره شماره
صفحات -
تاریخ انتشار 2006