A Possibility Linear Programming Approach to Solve a Fuzzy Single Machine Scheduling Problem
نویسندگان
چکیده
Department of Industrial Engineering, Faculty of Engineering, University of Kurdistan, Sanandaj, Iran ([email protected]) Department of Industrial Engineering, Faculty of Engineering, Tarbiat Modares University, P.O.Box 14115/111, Tehran, Iran ([email protected]) Department of Industrial Engineering, Mazandaran University of Science and Technology, P.O.Box 734, Babol, Iran ([email protected])
منابع مشابه
A Possibility Linear Programming Approach to Solve a Fuzzy Single Machine Scheduling Problem
This paper employs an interactive possibility linear programming approach to solve a single machine scheduling problem with imprecise processing times, due dates, as well as earliness and tardiness penalties of jobs. The proposed approach is based on a strategy of minimizing the most possible value of the imprecise total costs, maximizing the possibility of obtaining a lower total costs, and mi...
متن کاملTwo-stage fuzzy-stochastic programming for parallel machine scheduling problem with machine deterioration and operator learning effect
This paper deals with the determination of machine numbers and production schedules in manufacturing environments. In this line, a two-stage fuzzy stochastic programming model is discussed with fuzzy processing times where both deterioration and learning effects are evaluated simultaneously. The first stage focuses on the type and number of machines in order to minimize the total costs associat...
متن کاملMachine scheduling for multitask machining
Multitasking is an important part of today’s manufacturing plants. Multitask machine tools are capable of processing multiple operations at the same time by applying a different set of part and tool holding devices. Mill-turns are multitask machines with the ability to perform a variety of operations with considerable accuracy and agility. One critical factor in simultaneous machining is to cre...
متن کاملA Mathematical Programming Model and Genetic Algorithm for a Multi-Product Single Machine Scheduling Problem with Rework Processes
In this paper, a multi-product single machine scheduling problem with the possibility of producing defected jobs, is considered. We concern rework in the scheduling environment and propose a mixed-integer programming (MIP) model for the problem. Based on the philosophy of just-in-time production, minimization of the sum of earliness and tardiness costs is taken into account as the objective fu...
متن کاملA Project Scheduling Method Based on Fuzzy Theory
In this paper a new method based on fuzzy theory is developed to solve the project scheduling problem under fuzzy environment. Assuming that the duration of activities are trapezoidal fuzzy numbers (TFN), in this method we compute several project characteristics such as earliest times, latest times, and, slack times in term of TFN. In this method, we introduce a new approach which we call modif...
متن کاملAn improved memetic algorithm to minimize earliness–tardiness on a single batch processing machine
In this research, a single batch processing machine scheduling problem with minimization of total earliness and tardiness as the objective function is investigated.We first formulate the problem as a mixed integer linear programming model. Since the research problem is shown to be NP-hard, an improved memetic algorithmis proposed to efficiently solve the problem. To further enhance the memetic ...
متن کامل