Project management decisions using fuzzy linear programming
نویسنده
چکیده
Construction projects are complex in nature, which requires systematic and rational approach for decision-making. Linear Programming (LP) is one such technique widely used for optimal decision-making in a rigid environment. In LP model, the objective function and the constraints cannot be represented precisely in linguistic form causing difficulty in representing a real world problem. Usually, decision making in real world takes place in an environment in which the goals, constraints and the consequences of possible actions are not known precisely. Uncertainty has been one of the major factors that influence project performance and determines its ultimate success. Hence to obtain more realistic solution to the problems, a degree of flexibility is required to be introduced in to the crisp constraint inequalities. Accordingly, certain degree of flexibility is to be incorporated in the model parameters of the LP solution to optimize the project cost and the completion time. With the introduction of fuzzy set concepts, this desired flexibility could be incorporated in the model using fuzzy linear programming. This paper presents a practical application of fuzzy linear programming (FLP) in a real-life project network problem with two objectives as minimum completion time and crashing costs required to be optimized simultaneously. The FLP model considers both objectives simultaneously using the LP solution as the intervals for the objectives related with the membership functions which are not changed from DM to DM. Fuzziness in the problem stems from the imprecise aspiration levels attained by the decision maker to both the objectives. These imprecise aspiration levels are quantified using linear and continuous membership functions. The objective function of the FLP is to maximize the membership value of intersection of both the objectives, which forms the fuzzy decision. The problem is solved using LINGO modeling system release 8.0 computer package and the best-compromised solution is found. Comparisons between solutions of FLP and LP are also presented. This paper demonstrates the applicability of fuzzy linear programming for project least-cost scheduling. A case study has been considered to demonstrate the proposed methodology. ---------------------------------------
منابع مشابه
A fuzzy multi-objective model for a project management problem
In this research, the multi-objective project management decision problem with fuzzy goals and fuzzy constraints are considered. We constitute α-cut approach and two various fuzzy goal programming solution methods for solving the Multi-Objective Project Management (MOPM) decision problem under fuzzy environments. The Interactive fuzzy multi-objective linear programming (i-FMOLP) and Weighted Ad...
متن کاملFuzzy Multi-Objective Linear Programming for Project Management Decision under Uncertain Environment with AHP Based Weighted Average Method
Smooth implementation and controlling conflicting goals of a project with the usage of all related resources through organization is inherently a complex task to management. At the same time deterministic models are never efficient in practical project management (PM) decision problems because the related parameters are frequently fuzzy in nature. The project execution time is a major concern o...
متن کاملIncorporating Return on Inventory Investment into Joint Lot-Sizing and Price Discriminating Decisions: A Fuzzy Chance Constraint Programming Model
Coordination of market decisions with other aspects of operations management such as production and inventory decisions has long been a meticulous research issue in supply chain management. Generally, changes to the original lot-sizing policy stimulated by market prices may impose remarkable deviation revenue throughout the supply and demand chain system. This paper examines how to set the chan...
متن کاملA multi-period fuzzy mathematical programming model for crude oil supply chain network design considering budget and equipment limitations
The major oil industry upstream activities include the exploration, drilling, extraction, pipelines installation, and production of crude oil. In this paper, we develop a mathematical model to plan for theseoperations as a crude oil supply chain network design problem.The proposed multi-period mixed integer linear programming model entails both strategic (e.g., facility location and allocation)...
متن کاملApplying fuzzy goal programming to project management decisions with multiple goals in uncertain environments
In real-life situations, the project manager must handle multiple conflicting goals and these conflicting goals are normally fuzzy owing to information is incomplete and unavailable. This study develops a two-phase fuzzy goal programming (FGP) method for solving the project management (PM) decision problems with multiple goals in uncertain environments. The original multi-objective linear progr...
متن کاملAdaptive aggregate production planning with fuzzy goal programming approach
Aggregate production planning (APP) determines the optimal production plan for the medium term planning horizon. The purpose of the APP is effective utilization of existing capacities through facing the fluctuations in demand. Recently, fuzzy approaches have been applied for APP focusing on vague nature of cost parameters. Considering the importance of coping with customer demand in different p...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید
ثبت ناماگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید
ورودعنوان ژورنال:
- Int. J. Systems Science
دوره 37 شماره
صفحات -
تاریخ انتشار 2006