Economical Steel Plate Girder Bridges

نویسنده

  • RICHARD P. KNIGHT
چکیده

As a service to the bridge design profession, Bethlehem Steel has conducted hundreds of studies of steel plate girder bridges using its Preliminary Bridge Girder Optimization Program. The program is unique because it optimizes plate girder designs on the basis of least cost, not least weight. An evaluation of many study results leads to a number of guidelines which are offered in this paper. When applied by the bridge designer, these guidelines should result in economical steel plate girder designs for continuous composite bridges with span lengths of up to approximately 200 ft (61 m), representing a majority of the bridge population. Comparisons of various parameters are made on a cost index basis. These subjects are discussed: load factor vs. working stress design, weathering steel, painted high-strength steel, number of girders in a cross section, optimum web depth and thickness, transverse vs. longitudinal web stiffeners, flanges and flange splices, plus other considerations leading to cost effective steel plate girders for bridges. In the design of steel plate girder bridges, it used to be sufficient to determine a least weight solution and develop it as a complete set of plans for competitive bidding. That was believed to be the most economical design. However, over the past several years, many improvements have been made in design and analysis methods, materials and construction techniques, obliging the designer to consider an increased number of options. Today's heightened competition due to alternate bidding practices, including contractor sponsored alternates, makes it further incumbent upon all concerned with steel bridge design and construction to always strive for the most cost-effective solution.

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Optimal inspection scheduling with alternative fatigue reliability formulations for steel bridges

A reliability-based method for inspection scheduling of steel bridges is proposed to yield the optimal (most economical) inspection strategy that meets an acceptable safety level through the planned service life. Two fatigue reliability formulations that can be applied for most details in steel bridges are presented. For details classified according to AASHTO fatigue categories, a limit state f...

متن کامل

Comparison of Design Standards for Steel Railway Bridges

The popularity of steel bridges is increasing in the modern era because of its unmatchable advantages. Engineers are using various national codes to achieve an optimum design. Some of the Asian countries are using their own codes and also American and other country code provisions to achieve better economy and better standards. In this regard the comparison of design codes is relevant. Comparis...

متن کامل

Design Optimization and Structural Performance Evaluation of Plate Girder Bridge Constructed Using a Turn-Over Process

A recent trend in bridge construction has been the optimization of the cost-to-performance ratio. The most effective way to optimize the cost-to-performance ratio is to maximize the efficiency of the superstructure. Currently, many bridge engineers and designers favor two- or three- girder plate superstructures, due to their cost advantages. However, research on the performance enhancements of ...

متن کامل

Accurate Stress Analysis on Steel Box Girder of Long Span Suspension Bridges Based on Multi-Scale Submodeling Method

The streamline flat steel box girder is broadly used in long span cablesupported bridges all over the world. As one of the most important part of the bridges, its stress level and distribution under various dynamic loads are especially concerned. However, it is difficult to obtain the accurate stress of the steel box girder by common finite element (FE) calculation. The Runyang Suspension Bridg...

متن کامل

Analysis of Girder Differential Deflection and Web Gap Stress for Rapid Assessment of Distortional Fatigue in Multi-Girder Steel Bridges

Distortion-induced fatigue cracking in unstiffened web gaps is common in steel bridges. Previous research by the Minnesota Department of Transportation (Mn/DOT) developed methods to predict the peak web gap stress and maximum differential deflection based upon field data and finite element analyses from two skew supported steel bridges with staggered bent-plate and cross-brace diaphragms, respe...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:

دوره   شماره 

صفحات  -

تاریخ انتشار 1999