Properties of optimal schedules in preemptive shop scheduling
نویسندگان
چکیده
In this work we show that certain classical preemptive shop scheduling problems with integral data satisfy the following integer preemption property: there exists an optimal preemptive schedule where all interruptions and all starting and completion times occur at integral dates. We also give new upper bounds on the minimal number of interruptions for various shop scheduling problems.
منابع مشابه
Minimizing non-decreasing separable objective functions for the unit-time open shop scheduling problem
In this paper we study both the nonpreemptive and preemptive versions of the popular unit-time open shop scheduling problem. For the set of feasible schedules, we construct the linear description of the convex hull of the vectors of the job completion times. Based on the properties of the resulting scheduling polyhedron, we show that the problem of constructing an optimal schedule minimizing an...
متن کاملThe Preemptive Just-in-time Scheduling Problem in a Flow Shop Scheduling System
Flow shop scheduling problem has a wide application in the manufacturing and has attracted much attention in academic fields. From other point, on time delivery of products and services is a major necessity of companies’ todays; early and tardy delivery times will result additional cost such as holding or penalty costs. In this paper, just-in-time (JIT) flow shop scheduling problem with preemp...
متن کاملLECTURE #1 Roles of LPT List Scheduling on Parallel Machines
List Scheduling is an approach to finding an approximate non-preemptive schedule on parallel machines, initially due to Graham [4]. We present and analyze the approach for identical machines and an arbitrary jobs list. Then an algorithm based on the LPT (Longest Processing Time) list with an improved performance is discussed, based on [2, 5]. We stress the role of LPT schedules for determining ...
متن کاملDominance relations for two-machine flow shop problem with late work criterion
The paper concerns the two-machine non-preemptive flow shop scheduling problem with a total late work criterion and a common due date (F2|dj = d|Y ). The late work performance measure estimates the quality of a solution with regard to the duration of late parts of activities performed in the system, not taking into account the quantity of this delay. In the paper, a few theorems are formulated ...
متن کاملMILP Formulation and Genetic Algorithm for Non-permutation Flow Shop Scheduling Problem with Availability Constraints
In this paper, we consider a flow shop scheduling problem with availability constraints (FSSPAC) for the objective of minimizing the makespan. In such a problem, machines are not continuously available for processing jobs due to preventive maintenance activities. We proposed a mixed-integer linear programming (MILP) model for this problem which can generate non-permutation schedules. Furthermor...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید
ثبت ناماگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید
ورودعنوان ژورنال:
- Discrete Applied Mathematics
دوره 159 شماره
صفحات -
تاریخ انتشار 2011