Significant Factors Causing Cost Overruns in Large Construction Projects in Malaysia
نویسندگان
چکیده
Once a construction projects fails in achieving effective cost performance, it will result to cost overmn. These ovemrns are caused from several factors which are very important to uncover for improving the cost performance. In Malaysia, not many research works have been carried out on study~ng cost performance factors. Hence, this study was conducted to identify the significant factors causing cost overrun in large construction projects in Malaysia. Questionnaire for the survey was developed based on 35 common factors of cost overrun identified from literature work. These factors were grouped in 7 categories and validated by interviewing five experiencedpersonnel of construction industry. The feedback of from the survey resulted in receiving 262 sets of completed valid responses against 400 questionnaires distributed amongst contractors, consultants and clients involved in large construction projects. The data from the questionnaire was analyzed statistically. Relative importance index method was used for hierarchal assessment of factors and found that the top 3 most significant factors of cost overmn are fluctuation of prices of material, cash flow and financial difficulties faced by contractors and poor site management and supervision. These factors belong to two categories i.e., contractor's site management and financial management category, thus improvements in these categories are paramount for controlling cost overrun in construction projects.
منابع مشابه
Investigation of Significant Factors Influencing Time and Cost Overruns in Indian Construction Projects
Time overruns and Cost overruns has been a major issue in many Indian construction projects. The successful execution of construction projects and keeping them within prescribed schedule and cost is very important for effective time performance and cost performance. This research work is carried out on studying significant factors causing Time overruns and Cost overruns in Indian construction p...
متن کاملDelays and Cost Overruns in Infrastructure Projects: An Enquiry into Extents, Causes and Remedies
Media reports abound on instances of prolonged delays and excessive cost overruns in infrastructure projects. Only a small number of projects get delivered in time and within the budget. Examples of successful project implementation, like construction of the Delhi Metro Rail, are few and appear only far in between. Indeed, the problem of time and cost overruns in India is widespread and severe....
متن کاملAssessment of delays and cost overruns during construction projects in Pakistan
Construction projects are commonly delayed due to price escalation of building materials and faulty management in Pakistan. This research paper focused on the main reasons of delay and cost overruns. This research activity was exclusively assessed through questionnaire survey, interviews, field visits and discussion to the concerned authorities. A preplanned survey was conducted through a quest...
متن کاملEstimating Required Contingency Funds for Construction Projects Using Multple Linear Regression Thesis
Cost overruns are a critical problem for construction projects. The common practice for dealing with cost overruns is the assignment of an arbitrary flat percentage of the construction budget as a contingency fund. This research seeks to identify significant factors that may influence, or serve as indicators of, potential cost overruns. The study uses data on 243 construction projects over a fu...
متن کاملSEM-PLS Analysis of Inhibiting Factors of Cost Performance for Large Construction Projects in Malaysia: Perspective of Clients and Consultants
This study uncovered inhibiting factors to cost performance in large construction projects of Malaysia. Questionnaire survey was conducted among clients and consultants involved in large construction projects. In the questionnaire, a total of 35 inhibiting factors grouped in 7 categories were presented to the respondents for rating significant level of each factor. A total of 300 questionnaire ...
متن کامل