Failure risk management of buried infrastructure using fuzzy-based techniques
نویسندگان
چکیده
The effective management of failure risk of buried infrastructure assets requires knowledge of their current condition, their rate of deterioration, the expected consequences of their failure and the owner's (decision-maker) risk tolerance. Fuzzy-based techniques seem to be particularly suited to modeling the deterioration of buried infrastructure assets, for which data are scarce, cause-effect knowledge is imprecise and observations and criteria are often expressed in vague (linguistic) terms (e.g., 'good', 'fair' 'poor' condition, etc.). The use of fuzzy sets and fuzzy-based techniques helps to incorporate inherent imprecision, uncertainties and subjectivity of available data, as well as to propagate these attributes throughout the model, yielding more realistic results. This paper is the second of two companion papers that describe an entire method of managing risk of large buried infrastructure assets. The first companion paper describes the deterioration modeling of buried infrastructure assets, using a fuzzy rule-based, non-homogeneous Markov process. This paper describes how the fuzzy condition rating of the asset is translated into a possibility of failure. This possibility of failure is combined with the fuzzy failure consequences to obtain fuzzy risk of failure throughout the life of the pipe. This life-risk curve can be used to make effective decisions on pipe renewal. These decisions include when to schedule the next inspection and condition assessment or alternatively, when to renew a deteriorated pipe, and what renewal alternative should be selected.
منابع مشابه
A Prioritization Model for HSE Risk Assessment Using Combined Failure Mode, Effect Analysis, and Fuzzy Inference System: A Case Study in Iranian Construction Industry
The unavailability of sufficient data and uncertainty in modeling, some techniques, and decision-making processes play a significant role in many engineering and management problems. Attain to sure solutions for a problem under accurate consideration is essential. In this paper, an application of fuzzy inference system for modeling the indeterminacy involved in the problem of HSE risk assessm...
متن کاملUsing fuzzy FMEA and fuzzy logic in project risk management
Risk management is one of the most important phases of project management and isthe most recently used by many researchers. In this paper, a fuzzy based method wasproposed which identifies different kinds of risks through the project life cycle.Then, the project risk magnitude can be obtained in regards to five factors, namely“severity”, “occurrence”, and “not detection” which form fuzzy FMEA a...
متن کاملModeling failure risk in buried pipes using fuzzy Markov deterioration process
Numerous models have been proposed in the last two decades for the deterioration of buried pipes. The most prominent approach has been the Markovian deterioration processes (MDP), which requires that the condition of the deteriorating system be encoded as an ordinal condition state. This encoding is based on numerous distress indicators obtained possibly from direct and indirect observations, a...
متن کاملPower plant project risk assessment using a fuzzy-ANP and fuzzy-TOPSIS method
Economic growth in developing countries has resulted in increasing demand for infrastructure projects like power plants. To meet these development needs, the government of Iran has engaged companies to carry out power plant projects. While many papers have been written on the subject of project risk management, little information exists on the actual use of risk management in practice. The prim...
متن کاملDesign Software Failure Mode and Effect Analysis using Fuzzy TOPSIS Based on Fuzzy Entropy
One of the key pillars of any operating system is its proper software performance. Software failure can have dangerous effects and consequences and can lead to adverse and undesirable events in the design or use phases. The goal of this study is to identify and evaluate the most significant software risks based on the FMEA indices with respect to reduce the risk level by means of experts’ opini...
متن کامل