Scheduling for Cellular Manufacturing
نویسندگان
چکیده
Alcatel-Lucent is a major player in the eld of telecommunications. One of the products it o ers to network operators is wireless infrastructure such as base stations. Such equipment is delivered in cabinets. These cabinets are packed with various pieces of electronics: lters, ampli ers, circuit packs, etc. The exact con guration of a cabinet is dependent upon the circumstances it is being placed in, and some 20 product groups can be distinguished. However, the variation in cabinets is large, even within one product group. For this reason, they are built to order. In order to improve cost, yield and delivery performance, lean manufacturing concepts were applied to change the layout of the factory to one based on cells. These cells focus on improving manufacturing through standardised work, limited changeovers between product groups and better utilisation of test equipment. A key component in the implementation of these improvements is a system which schedules the cells to satisfy customer request dates in an e cient sequence. This paper describes the transformation and the tool that was built to support the new method of operations. The implementation has achieved signi cant improvements in manufacturing interval, work in process inventory, rst test yield, headcount, quality (i.e. fewer defects are found during the testing stage) and delivery performance. Although these bene ts are mainly achieved because of the change to a cell layout, the scheduling tool is crucial in realising the full potential of it.
منابع مشابه
Scheduling Problem of Virtual Cellular Manufacturing Systems (VCMS); Using Simulated Annealing and Genetic Algorithm based Heuristics
In this paper, we present a simulated annealing (SA) and a genetic algorithm (GA) based on heuristics for scheduling problem of jobs in virtual cellular manufacturing systems. A virtual manufacturing cell (VMC) is a group of resources that is dedicated to the manufacturing of a part family. Although this grouping is not reflected in the physical structure of the manufacturing system, but machin...
متن کاملScheduling Problem of Virtual Cellular Manufacturing Systems (VCMS); Using Simulated Annealing and Genetic Algorithm based Heuristics
In this paper, we present a simulated annealing (SA) and a genetic algorithm (GA) based on heuristics for scheduling problem of jobs in virtual cellular manufacturing systems. A virtual manufacturing cell (VMC) is a group of resources that is dedicated to the manufacturing of a part family. Although this grouping is not reflected in the physical structure of the manufacturing system, but machin...
متن کاملStudy and Implementation of Lean Manufacturing in a Garment Manufacturing Company: Bangladesh Perspective
Lean manufacturing is a systematic approach to identifying and eliminating wastes (non-value added activities) through continuous improvement by conveying the product at the pull of the customer in pursuit of production. In a more basic term, more value with less work. Since lean manufacturing eliminates many of the problems associated with poor production scheduling and line balancing, lean ma...
متن کاملزمانبندی گروهی با در نظر گرفتن اثر یادگیری در سیستم تولید سلولی
The group scheduling problem in the cellular manufacturing system is comprised of two levels of scheduling. At the first level, the sequence of parts in each part-family is determined, and then at the second level the sequence of part-families is determined. In this paper, the flow shop group scheduling is investigated in order to minimize the makespan. In traditional group scheduling problems,...
متن کاملA HYBRID GENETIC ALGORITHM FOR A BI-OBJECTIVE SCHEDULING PROBLEM IN A FLEXIBLE MANUFACTURING CELL
This paper considers a bi-objective scheduling problem in a flexible manufacturing cell (FMC) which minimizes the maximum completion time (i.e., makespan) and maximum tardiness simultaneously. A new mathematical model is considered to reflect all aspect of the manufacturing cell. This type of scheduling problem is known to be NP-hard. To cope with the complexity of such a hard problem, a genet...
متن کاملTechniques for cash management in scheduling manufacturing operations
The objective in traditional scheduling is usually time based. Minimizing the makespan, total flow times, total tardi costs, etc. are instances of these objectives. In manufacturing, processing each job entails a cost paying and price receiving. Thus, the objective should include some notion of managing the flow of cash. We have defined two new objectives: maximization of average and minimum av...
متن کامل