Using the EPQ with Partial Backordering for Coordinated Planning of a Product and its Components
ثبت نشده
چکیده
While there has been considerable work over the years on multistage lot-sizing models, particularly in an MRP environment, there has been relatively little work on systems recognizing the WIP effects when there is gradual conversion of the components into the final product, as in production planning using the EPQ model for planning the final product. Here we consider lot-sizing planning for a twostage system in which the final product is planned using an EPQ model with partial backordering and the production of the components is controlled using basic EPQ models without backordering.
منابع مشابه
Economic manufacturing model under partial backordering and sustainability considerations
Today, “Sustainable production” has attracted a great deal of interest by academic researchers and practitioners due to the raising environmental and social concerns. Sustainable EPQ model has been developed as a result of this interest and also necessity. This paper develops a novel sustainable EPQ (SEPQ) model under partial backordering consideration. The model converts all emission variation...
متن کاملBi-product inventory planning in a three-echelon supply chain with backordering, Poisson demand, and limited warehouse space
In this paper, we apply continuous review (S-1, S) policy for inventory control in a three-echelon supply chain (SC) including r identical retailers, a central warehouse with limited storage space, and two independent manufacturing plants which offer two kinds of product to the customer. The warehouse of the model follows (M/M/1) queue model where customer demands follow a Poisson probabilit...
متن کاملOptimizing a bi-objective vendor-managed inventory of multi-product EPQ model for a green supply chain with stochastic constraints
In this paper, a bi-objective multi-product single-vendor single-buyer supply chain problem is studied under green vendor-managed inventory (VMI) policy based on the economic production quantity (EPQ) model. To bring the model closer to real-world supply chain, four constraints of model including backordering cost, number of orders, production budget and warehouse space are considered stochasti...
متن کاملTwo Heuristics for the Basic EOQ and EPQ with Partial Backordering
This paper describes two heuristics for the basic economic order quantity and economic production quantity with partial backordering that use the time between orders and the percentage of demand filled from stock as the decision variables. Tests of the heuristics on a set of problems generated by using different values for six situational characteristics indicate that both heuristics should per...
متن کاملAn Extension to the Economic Production Quantity Problem with Deteriorating Products Considering Random Machine Breakdown and Stochastic Repair Time
The recent advances in manufacturing systems motivate several studies to focus on Economic Production Quantity (EPQ) problem. Althuogh there are several extentions to the EPQ, this paper provides a new extension by considering some of the real world parameters like: (a) shortages in the form of partial backordering, (b) inventory can deteriorate stochastically, (c) machine can break down stocha...
متن کامل