SLIM: Short Cycle Time and Low Inventory in Manufacturing at Samsung Electronics
نویسندگان
چکیده
Robert C. Leachman • Jeenyoung Kang • Vincent Lin Department of Industrial Engineering and Operations Research, University of California at Berkeley, Berkeley, California 94720–1777 IBM Korea, Inc., MMAA Building, Dogok-dong, Gangnam-gu, Seoul, Korea 467–12 Leachman and Associates LLC, 5870 Carmel Way, Union City, California 94587 [email protected] • [email protected] • [email protected]
منابع مشابه
Special Issue: Franz Edelman Award for Achievement in Operations Research and the Management Sciences: SLIM: Short Cycle Time and Low Inventory in Manufacturing at Samsung Electronics
Robert C. Leachman • Jeenyoung Kang • Vincent Lin Department of Industrial Engineering and Operations Research, University of California at Berkeley, Berkeley, California 94720–1777 IBM Korea, Inc., MMAA Building, Dogok-dong, Gangnam-gu, Seoul, Korea 467–12 Leachman and Associates LLC, 5870 Carmel Way, Union City, California 94587 [email protected] • [email protected] • vincent@leachma...
متن کاملAn EPQ Model for Product Life Cycle (Maturity Stage) with Deteriorating Items and Shortages
A product life cycle is the life span of a product in which the period begins with the initial product specification and ends with the withdrawal from the market of both the product and its support. A product life cycle can be divided into several stages characterized by the revenue generated by the product. This study investigates inventory control policies in a manufacturing system for a si...
متن کاملFactorial Validity and Reliability of Persian Version of Serious Leisure Inventory and Measure (SLIM) Scale
Awareness of goals of participation in sport and leisure activities is one of the major targets of sport marketers. Serious leisure inventory and measure (SLIM) scale is one of the valid tools made to be aware of the consequences of participation in the leisure activities in the management of leisure time. The aim of the present study was to examine the validity and reliability of the Persian ...
متن کاملModelling Dynamic Production Systems with a Special Focus on Dynamic Bottlenecks
Bottlenecks play the key role in determining overall performance of manufacturing systems. Improving the performance of bottlenecks may lead to low inventory, appropriate utilization, short lead time and low schedule deviation. Therefore, consideration of bottlenecks is of prime importance at all levels of decision-making in production management practice (e.g. Production Planning and Control) ...
متن کاملDesign for Production: Using Manufacturing Cycle Time Information to Improve Product Development
Title of Dissertation: DESIGN FOR PRODUCTION: USING MANUFACTURING CYCLE TIME INFORMATION TO IMPROVE PRODUCT DEVELOPMENT Mandar M. Chincholkar, Doctor of Philosophy, 2002 Dissertation directed by: Associate Professor Jeffrey W. Herrmann Department of Mechanical Engineering and Institute for Systems Research Product development teams employ many methods and tools as they design, test, and manufac...
متن کامل